• At last, the optimization suggestion on the engineering disposal measure to the site foundation and the design as well as construction of the embankment is brought forward.

    最后对场区地基工程处理措施及填方体设计与施工提出优化建议。

    youdao

  • At last, the optimization suggestion on the engineering disposal measure to the site foundation and the design as well as construction of the embankment is brought forward.

    最后对场区地基工程处理措施及填方体设计与施工提出优化建议。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定