Understanding if the successful test was the most optimal test possible, or if changes to the application code or envoironment configuration are needed.
了解成功的测试是否是最优测试,或者是否需要对应用程序代码或环境配置进行更改。
The following is the equipment tests and the optimal test methods to be implemented.
以下列出了需要执行的设备试验以及最佳试验方法。
The problems of optimal test point selection and optimal diagnosis tree generation are discussed in this paper.
文中讨论了基于相关性矩阵的测试点优化方法和故障诊断树的生成方法。
The implementation of automatic generating the optimal test set and fast locating all the faults is also discussed.
文章还阐述了自动产生最佳测试集和快速定位所有故障的具体实施方法。
With the proposed method, the problem of selecting optimal test nodes to the case of existing tolerance can be solved effectively.
提出了一种能有效地解决有容差情况下最佳测试节点选取问题的新方法——混叠集分析法。
The problem of constructing optimal test sequences to diagnose permanent faults in process industrial systems whose test attribute may have multi-values is considered.
针对过程工业系统故障诊断的检测次序问题,其检测属性存在多个取值。
D-optimal test scheme was presented for calibrating second-order coefficient K2 of PIGA (Pendulous Integrating Gyro Accelerometer) error model on a precision centrifuge with counter-rotating platform.
提出了一种在带有反转平台的精密离心机上标定陀螺加速度计误差模型二次项系数K 2的D -最优试验方案。
D-optimal test scheme was presented for calibrating second-order coefficient K2 of PIGA (Pendulous Integrating Gyro Accelerometer) error model on a precision centrifuge with counter-rotating platform.
提出了一种在带有反转平台的精密离心机上标定陀螺加速度计误差模型二次项系数K 2的D -最优试验方案。
应用推荐