Mining operations at the existing open pit are due to cease by theend of 2012, although ERA is processing a proposal to develop the undergroundRanger 3 Deeps exploration area.
尽管ERA正在处理一份开发Ranger3Deeps地下勘探区的提议,但现有露天矿的开采作业将于2012年底到期。
Greenhouse gas emissions of tar sands crude are 40% higher than conventional oil, and the open-pit mining has devastated Alberta's boreal forest.
焦油砂的温室气体排放量比普通石油高40%,露天采矿已经极大地破坏了阿尔伯塔的北方气候带森林。
An experimental test of bench mining in the high and dangerous slope of a certain open-pit mine was made.
在某露天矿山的高危边坡上进行了台阶采矿的试验研究。
This CAD software system for open-pit mine production planning is designed in accordance with the characters of the mining system of Huolinhe South Open-Pit Mine.
针对霍林河南露天矿开采设计的特点,开发研制了露天矿生产计划CAD软件系统。
In combination with the boundary conditions of open-pit and the development system of the underground mining transferred from open-pit, a high efficient induced caving method is proposed.
结合露天开采的边界条件与露天转地下开拓系统条件,提出诱导冒落法高效开采方案。
In the mining of open pit, the large mechanical excavators are widely used.
在露天矿的开采中,大型矿用机械式挖掘机得到了广泛的应用。
The feasibility of increasing open pit′s service life by deeping the final mining elevation, treating lean copper ore in the piles, recovering stope side ore is discussed.
论述了延长铜山口矿露天采场服务年限的必要性 ,探讨了通过延深最终开采标高、处理堆场贫铜矿、回收挂帮矿量等途径以达到延长露采服务年限目的的可行性。
Controlled slope wall blasting plays key role in open pit mining.
边坡控制爆破在露天矿山起着至关重要的作用。
The optimization design mainly consists of two contents: adjustment of the mining boundary of open pit and optimization of production scale.
优化设计主要包括两方面的内容:露天开采境界的调整和生产规模的优化。
The hanging wall ore of the open-pit is one of important projects in transition from open pit to underground in Daye iron mine, and the shallow hole shrinkage mining method is adopted in the project.
大冶铁矿露天采场挂帮矿是该矿山露天转地下项目的重要工程,采用浅孔留矿法进行开采。
Open-pit limit optimization is an important content in open-pit mining design and production process control.
露天境界优化是露天矿开采设计和生产过程控制的重要内容。
Open-pit mining follows the same sequence of oprations as underground mining: drilling, blasting, and loading and removing waste and ore.
露天采矿遵循与地下采矿相同的作业顺序:钻孔、爆破、装载并运走废料和矿石。
Open-pit mining follows the same sequence of operations as underground mining: drilling, blasting, and loading and removing waste and ore.
露天采矿遵循与地下采矿相同的作业顺序:钻孔、爆破、装载并运走废料和矿石。
Relative to the waste rock dump of underground mining, open-pit mining needs a larger one.
相对于地下开采的废石场,露天开采的排土场占地面积要大得多。
The choice of mining technology for open pit mine is an important part of open pit design, which will directly affect the economic benefits of mine.
露天矿开采工艺的选择是露天矿设计的重要环节,直接影响到露天矿的经济效益。
Research on the safety and stability of slope in open-pit mining is very significant to safety production of open mines.
研究露天开采边坡的安全稳定对露天矿山的安全生产具有重要意义。
Production of dust in the course of open pit mining in Jinduicheng Molybdenum mining Corporation was analysed. The prevention and counter measures of dust pollution was put forward.
分析了金堆城钼业公司露天采矿过程中粉尘污染物的产生,提出了粉尘污染的防治与对策。
The similar material experiment and the numerical simulation calculation were adopted to analyze the slope stability in combining mining of open-pit with underground mining.
采用相似材料模拟试验以及数值模拟计算研究了井工露天复合开采条件下边坡的稳定性。
During the mine from open - pit to underground mining, a key question is how to keep the stable transition.
在露天转地下开采过程中,一个关键问题是如何确保其平稳过渡。
In this paper, the research is carried out deeply aimed at the problems of the structure parameters of underground stope for transition from open pit to underground Mining in Shirengou Iron Mine.
针对石人沟铁矿露天转地下过渡期开采I区地下采场结构参数问题展开了深入研究。
It will be a short time for Nanfen open-pit iron mine to mine in the third stage. The mine should be engaged on deep part mining design at once.
南芬铁矿目前正在进行的三期境界开采的服务年限已经不长了,矿山需要马上着手进行下期深部开采设计。
The establishment of the computer model for the ore body of open pit mine is the basis for the optimization of deposit mining boundary and the mining production scheduling.
露天矿矿体计算机模型的建立是进行矿床开采境界优化及制定矿山生产计划的基础。
Using the existing open pit, the stripping and mining site is rationally adjusted, and conditions are created for realizing the inner dump and extending the open pit service life of Gushan Iron Mine.
利用现有的露天采坑,合理调整采剥部位,创造条件实现内部排土,延长了姑山铁矿露天采场的服务年限。
Open pit mining production scheduling is of guidance significance to the mine construction and balanced production.
采掘进度计划对矿山建设和均衡生产具有指导作用。
In open pit mining project the stability of high slope is affected and controlled by many factors, such as topography, meteorology, hydrology, stratum lithology and geological structure conditions.
露天采矿工程中的高边坡稳定性受到很多因素的干扰与控制,其中包括地形条件,气象、水文条件,地层岩性条件,地质构造条件等。
A large amount of dust and harmful gas are produced in the open - pit mining process, which can affect a large area and cause serious consequences.
露天矿开采过程产生大量粉尘和有毒有害气体,影响范围广,造成严重后果。
This paper presents the concept of surface-underground combined mining method and discusses the difference from combined open-pit and underground mining.
阐述了露天-地下联合采矿法的概念及其与传统的露天-地下联合开采的区别。
The ore-body block model is not only widely used in ore grade and reserve calculation, but used in the optimization of the final mining boundary and mining plan in the open pit.
矿体块状模型广泛应用于品位、储量计算,也可用于露天矿最终开采境界优化和开采计划优化。
The red soil in open-pit mine in inner-Mongolia has specifical engineering geological properties and limits the utilizable function of mining and hauling equipments.
内蒙露天煤矿中红土的工程地质性质特殊,它制约着采运设备效率的发挥。
These are of certain reference value and practical significance on the open mining and the stability evaluation of the slopes of the open pit.
这些对露天开采及露天矿边坡的稳定性评价具有一定的参考价值及实际意义。
应用推荐