• If an activity on the critical path is a week late, you can't sit idly and allow the entire project to be a week late.

    如果处在关键路径某个活动延期一周不能傻坐着眼整个项目延期一周。

    youdao

  • This 20% of code is on the "critical path" and it is these areas that are worth optimizing for performance.

    20%代码位于关键路径”上,正是这些方面值得进行性能优化

    youdao

  • If not, determine the critical path and look for ways to accelerate these activities to get you back on track.

    找出关键路径寻找加速执行相关工作办法以便能重回正轨。

    youdao

  • This places the "orange" resource on the critical path.

    就在关键路径放置了一个桔红色资源

    youdao

  • It dispenses those environments into an on-premise cloud, and once they are out and running, the appliance is not a part of the critical path for that application.

    这些环境分配一个预置云中并且一旦环境启动运行,那么设备不再成为应用程序关键部分。

    youdao

  • Because we've recognized this trend early, we can redistribute our resources to sharpen our focus on critical-path activities.

    因为我们已经认识到这个趋势,我们可以重新分配资源加深对于关键路径活动的关注

    youdao

  • You will review each of the activities on the critical path and identify the potential risks that could put your schedule in jeopardy.

    检查关键路径每一活动识别可能破坏进度风险

    youdao

  • EBay is so convinced of the future of mobile phone shopping that on Wednesday it acquired Critical Path Software, a mobile phone app developer, to speed its move into this new arena.

    这里输入译文易趣移动手机购物未来充满了信心,易趣为了加快自己这个领域的步伐周三购入Critical Path软件公司,这一件移动手机应用程序开发公司

    youdao

  • By choosing an appropriate monitor function, the density of mesh points near the critical points can be bigger than that near other points on the minimal energy path.

    通过在自适应零温度弦方法中选择合适控制函数可以使得最小能量路径网格密度这些临界点附近比较大

    youdao

  • For example, you can clearly see the critical path for tasks people are working on if you filter for in-progress tasks and group by critical.

    例如如果对进行中的任务进行筛选按“关键任务”进行分组可以清楚地查看工作人员处理任务的关键路径

    youdao

  • In this paper we discuss the distribution of vertices of degree 5 on the longest path and cycle and thus give a characterization of contraction critical 5-connected graph in a certain aspect.

    讨论收缩临界5 -连通最长最长5分布情况,刻画收缩临界5 -连通图的结构。

    youdao

  • It also includes implementing the project plan, along with careful controls to stay on the "critical path", that is, to ensure the plan is being managed according to the plan.

    包括执行项目计划同时认真管理使其处于关键途径”上,即确保按计划进行。

    youdao

  • In this paper, on the basis of static timing analysis, a new method is employed to enhance the efficiency of FPGA partition by extracting the information of critical path-delay.

    文章静态时序分析基础上,提出了种利用关键路径时延信息提高FPGA分割效率方法

    youdao

  • Then a detailed ASIC design of the SHA-1 algorithm module is given, whose logic on the longest critical path is optimized.

    随后给出SHA - 1算法模块详细ASIC设计优化了SHA - 1模块最长关键路径逻辑结构。

    youdao

  • S method, which was created by Kato Shokichi (Japan), the event on the critical path should be done first.

    通常流行的日本加藤昭吉S,主张关键工序进行。

    youdao

  • The critical points on the minimal energy path, which often denote stable states or transition states, are concerned.

    最小能量路径临界点往往表示稳定状态或者转化状态,人们所关心的。

    youdao

  • This paper put forward a simplified method that can be used on activity on node network and activity on line network to identify the critical path of schedule.

    提出一种简化确定关键路径方法,该方法分别运用单代号双代号网络图中。

    youdao

  • This paper also designs the computerized critical path algorithm and the network graph drawing algorithm based on the graph theory and project management technique.

    论述技术以及项目管理技术,并且根据图论技术项目管理技术设计关键路径算法以及网络图绘制算法。

    youdao

  • First of all, the paper USES work Load Point assessment system, work breakdown structure and critical path method to build the control and monitor system based on the work Load Point system.

    首先本文运用工作负荷系统评估系统、项目分解结构以及关键路线构建基于工作负荷点系统的进度度量监控体系

    youdao

  • On the other hand, the critical path to business success is not the technology itself, but changing the business process and the work supported by the technology.

    一方面,商业成功关键要素不是技术本身而是改变技术所支持的业务流程工作

    youdao

  • To verify deadlines of activity instances within workflow, a method of dynamic verification was proposed based on the critical path.

    为了动态验证工作流活动实例截止期限,提出基于关键路径进行动态验证方法

    youdao

  • However, a critical path can end, as an example, on a schedule milestone that is in the middle of the project schedule and that has a finish-no-later-than imposed date schedule constraint.

    然而,可举例说明,关键路线可以止于处于项目进度表中间,并受到“不迟于完成”类型强加日期进度约束计划里程碑

    youdao

  • This paper analyzes the time-scaled network plan applied to confirm critical path, gain time factors, control network plan and so on.

    就时网络计划在工程中如何确定关键线路分析工作时间参数、进行网络计划的控制等进行阐述

    youdao

  • Inattention and muddling through may be the path of least resistance, but they should not and must not represent our national policy on this critical issue.

    淡漠敷衍了事可能走阻力最小他们不能代表我们应该这个关键问题上的国家政策

    youdao

  • Based on the study of calculating approaches of fuzzy network, this paper puts forward a new method to calculate the parameters and determine the critical path of fuzzy network planning.

    基于模糊网络计算方法研究提出新的网络参数计算关键线路判断方法

    youdao

  • This paper also designs the computerized critical path algorithm and the network graph drawing algorithm based on the graph theory and project management technique.

    由于系统网络形式进行工程管理,因此提供一个简单、直观制作网络图的平台。

    youdao

  • Total lead time for an end item, calculated by taking the individual lead times for all items on the critical path through all levels of the bill of material.

    最终产品总共前置时间物料清单所有产品前置时间计算得出。

    youdao

  • Finally, an engineering project application case is analyzed to illustrate the whole process of Earned Value management based on the reward and penalty system of time and the critical path.

    最后本文通过一个工程项目案例具体演示基于工期奖罚制度关键路径管理使用过程

    youdao

  • Finally, an engineering project application case is analyzed to illustrate the whole process of Earned Value management based on the reward and penalty system of time and the critical path.

    最后本文通过一个工程项目案例具体演示基于工期奖罚制度关键路径管理使用过程