Meanwhile, utility workers are extending an emergency power cable to the 40-year-old complex. That would allow a steady supply of electricity to run water pumps.
同时,公用事业工人们也在往这个修建了40年的建筑群铺设一条紧急电缆,为水泵的运转提供不间断的供电。
Meanwhile, utility workers are extending an emergency power cable to the 40-year-old complex. That would allow a steady supply of electricity to run water pumps.
同时,公用事业工人们也在往这个修建了40年的建筑群铺设一条紧急电缆,为水泵的运转提供不间断的供电。
应用推荐