This concept is the integration of identical parallel machine scheduling with flow shop scheduling. The solution to IFSP is a non- polynomial computation of time problem.
采用网络理论构造了平行流水作业的非连接图模型,提出了采用蚁群算法求解平行流水作业计划问题,以及求解过程中可行路径表的建立方法。
This concept is the integration of identical parallel machine scheduling with flow shop scheduling. The solution to IFSP is a non- polynomial computation of time problem.
采用网络理论构造了平行流水作业的非连接图模型,提出了采用蚁群算法求解平行流水作业计划问题,以及求解过程中可行路径表的建立方法。
应用推荐