The objectives of the NCCC are to explore business opportunities;
北卡中国中心的将致力于寻求商业机会;
It is indicated that collaboration capability of resources, information and operations between different companies in NCCC depends on the integration of mult...
指出企业间资源、信息与业务的协同能力依赖于时间、成本、性能以及持续竞争优势等多个约束因素的协调。
The efforts of the NCCC in 1976 delivered North Carolina to Ronald Reagan at a point where his primary campaign was collapsing, and stiffened his spine for subsequent runs for office.
在罗纳德·里根首站竞选失败的时候,NCCC于1976年的努力为他在北卡州的选举中获得了胜利。这次胜利也加强了罗纳德·里根在以后竞选中的信心。
It is indicated that collaboration capability of resources, information and operations between different companies in NCCC depends on the integration of multi elements, such as time...
指出企业间资源、信息与业务的协同能力依赖于时间、成本、性能以及持续竞争优势等多个约束因素的协调。
It is indicated that collaboration capability of resources, information and operations between different companies in NCCC depends on the integration of multi elements, such as time...
指出企业间资源、信息与业务的协同能力依赖于时间、成本、性能以及持续竞争优势等多个约束因素的协调。
应用推荐