No. 4 subway station next to the Nan Pu Bridge Road, turn 65, or Metro Line 2 Nanjing East Road station taxi after about starting fee.
地铁4号到南浦大桥站下转65路,或地铁2号线南京东路站下后打车约起步费。
Through a great number of Pu-Nan experiment datas, the pater put forward to the mixture design method, requirement of aggregate, gradation of mixture for dense graded aggregate base.
本文结合浦南路实测资料,提出了多雨潮湿地区级配碎石的设计指标、材料技术要求、级配范围要求。
Through a great number of Pu-Nan experiment datas, the pater put forward to the mixture design method, requirement of aggregate, gradation of mixture for dense graded aggregate base.
本文结合浦南路实测资料,提出了多雨潮湿地区级配碎石的设计指标、材料技术要求、级配范围要求。
应用推荐