T-N, T-P and Zn were the priority pollutants to be monitored and controlled in Dongta.
总氨、总磷、锌是重点监测和控制的优先污染物。
The problem is to determine the optimal replacement policy ( N , T )? such that the long-run expected cost per unit time is minimized.
利用几何过程,以系统大修次数N和大修时间间隔T为更换策略,选择最优策略( N , T)使系统经长期运行单位时间的期望费用最小。
"That would not be a problem at the n. T. S. B.," he said. "If the board found that a part needed to be recalled, they would make that recommendation."
“这在美国国家运输安全委员会内不算什么问题,”他说道,“如果委员会发现了飞机的某些部件需要召回,他们就会发出相应的通知。”
"That would not be a problem at the n. T. S. B.," he said. "If the board found that a part needed to be recalled, they would make that recommendation."
“这在美国国家运输安全委员会内不算什么问题,”他说道,“如果委员会发现了飞机的某些部件需要召回,他们就会发出相应的通知。”
应用推荐