Real time capable dynamic model of boiler and non real time capable dynamic model of boiler of 330 MW unit are established.
以典型的330MW发电机组为对象分别建立了锅炉的实时和非实时动态模型。
This paper introduces collision tests used in Huaneng Yuhuan Power Plant 1 000 MW unit axial and radial alignments of turbine HP, IP and LP casings.
详细介绍了华能玉环电厂1 000MW机组采用碰撞试验的方法进行汽轮机高、中、低压缸轴向、径向定位。
The principle, system technological process and main equipment used in desulfurization project of flue gas circulating fluidized bed for 100 MW unit in Xiaolong Tan Power Plant are presented.
阐述了小龙潭发电厂100MW机组烟气脱硫工程的工艺原理、系统流程、主要设备等,并结合系统调试过程中发现的问题,对该工艺的运行调试进行了评述。
This article introduces the retrofitting process the economics of retrofitted steam turbine and finally puts forward the views and proposals for further improving the economics of 125 MW unit.
通过对汽轮机通流部分改造过程介绍和改造后的经济性分析,提出进一步提高125MW机组经济性的看法和建议。
This paper introduces water pump house caisson construction of Huaneng Yuhuan Power Plant 1 000 MW unit, including geological conditions, structure and construction preparation, ordering and scheme.
对华能玉环电厂1 000MW机组工程的雨水泵房沉井施工作了介绍,包括:地质条件、结构型式和施工准备、顺序、方案。
This paper introduces water pump house caisson construction of Huaneng Yuhuan Power Plant 1 000 MW unit, including geological conditions, structure and construction preparation, ordering and scheme.
对华能玉环电厂1 000MW机组工程的雨水泵房沉井施工作了介绍,包括:地质条件、结构型式和施工准备、顺序、方案。