Meanwhile, every mining technology was synthetically evaluated and the best plan was gained by applying fuzzy comprehensive evaluation method.
应用模糊综合评价法对各回采工艺方式进行综合评价,得到了最优方案。
The technology of crossing over fault, drifting and actual mining method and plan of crossing over fault at combined mining face under complex geology conditions in Jining no.
介绍了济宁二号矿复杂地质条件下综放工作面过断层技术,掘进和回采对断层的处理方法及回采工作面制定过断层方案的步骤。
An intelligent decision software for mining plan has been developed by combining mining CAD technique with intelligent method and achieved good results.
为此将人工智能科学与矿山CAD技术集成,开发出露天矿生产计划智能决策计算机系统,取得较好效果。
This article also puts forward the concept and evaluation method of the stable critical point of the pressure drop. therefore it has supplied the basis for deter - mining the optimum transfer plan.
本文还提出了在生产实际中有意义的压降稳定临界点的概念和求法,为确定最佳输送方案提供了依据。
Data Mining can be realized as the good method to analyze these data and provide powerful supporting for making marketing plan and predicating development trend.
采用数据挖掘技术来实现对这些信息的科学分析,为企业制定合理的营销方案提供决策支持。
Data Mining can be realized as the good method to analyze these data and provide powerful supporting for making marketing plan and predicating development trend.
采用数据挖掘技术来实现对这些信息的科学分析,为企业制定合理的营销方案提供决策支持。
应用推荐