And it has provided one new ideal to the development of each CAD system in mine planning.
该系统为煤矿设计中各专业设计软件的开发提供了一些新思路。
This paper demonstrates the optimization of the nearly flat seam underground coal mine planning by the multi-objective decision-making method.
文章采用多目标决策法进行近水平煤层矿井设计的最优化。
The planning process for the Galantas mine in Omagh took 11 years.
Galantas公司在奥马市的矿可花了11年的时间才完成筹划过程。
Mine geography information system (MGIS) applies GIS to mine regional geography information system and provide the support for mining, design and planning of mining by the utilization of GIS.
矿山地理信息系统(MG IS)是将G IS应用于矿山的区域性地理信息系统,利用GIS为矿山生产、设计、规划等提供支持。
Mining giant Xstrata, to take one example, has been planning a A$6 billion coal mine that is part of a A$150 billion complex of projects in central Queensland to export coal and LNG to Asia.
例如,矿业巨头Xstrata最近一直计划开始一个60亿澳元的煤矿项目,这个项目作为昆士兰中部一个1500亿澳元项目的一部分,将向亚洲国家出口煤和液化天然气。
The evaluation of unreclaimed land productive potential in surface coal mine are keys for promulgating land reclamation planning in the mine.
露天煤矿待复垦土地生产潜力评价是编制土地复垦规划的一个重要内容。
The present international and home situations of mine closure planning are summarized and analyzed in this paper, whose significance in China is discussed.
总结分析了矿山关闭规划的国内外现状,并讨论了在中国开展闭矿规划的意义。
The accurate simulation and prediction of the land utilization evolution of mine, is an important basis for determining the land use planning, land reclamation measures.
准确、可靠地模拟和预测煤矿区土地利用演化,是矿区制定土地利用规划、土地复垦措施的重要依据。
The establishment of land reclamation information system based on GIS in mine is of great significance to the land resource management and land reclamation planning decisions.
基于GIS建立矿区土地复垦信息系统,对矿区土地资源管理和土地复垦规划决策具有重要意义。
This CAD software system for open-pit mine production planning is designed in accordance with the characters of the mining system of Huolinhe South Open-Pit Mine.
针对霍林河南露天矿开采设计的特点,开发研制了露天矿生产计划CAD软件系统。
Optimizing the Construction Organization Planning, Decreasing the Tunes of Uncovering Coal Seam, Shortening the Period of Mine Construction.
优化施工组织设计,减少揭煤次数,缩短建井工期。
Optimizing the Construction Organization Planning, Decreasing the Tunes of Uncovering Coal Seam, Shortening the Period of Mine Construction.
优化施工组织设计,减少揭煤次数,缩短建井工期。
应用推荐