Recommendations of design for large fan unit in coal mine construction from now on are raised.
对今后煤矿建设中大型通风机装置的设计提出了建议。
Open pit mining production scheduling is of guidance significance to the mine construction and balanced production.
采掘进度计划对矿山建设和均衡生产具有指导作用。
Tunnels are the core of mine projects, and 3D tunnel modeling is an important component of digital mine construction.
巷道是矿山工程的核心,巷道三维建模是数字矿山建设的重要组成部分。
The prevention of freezing pipe breaks in deep shaft freezing has become a key technique in mine construction in China.
防止冻结管断裂在国内深井冻结中已成为关键技术。
Taking a mine construction project as an example, studies the EPC + IS project management mode of the concrete operation process.
以某矿山建设项目为例,对EPC +IS工程管理模式的具体运作流程进行阐释。
There distributes a great number of karst caves in southwest of Guizhou province and they bring great difficulties to mine construction.
中国黔西南地区溶洞较多,岩溶地区实施矿山工程难度大。
Optimizing the Construction Organization Planning, Decreasing the Tunes of Uncovering Coal Seam, Shortening the Period of Mine Construction.
优化施工组织设计,减少揭煤次数,缩短建井工期。
The research on structural development pattern and genetic mechanism provided mine construction and production with geological basis henceforth.
赵楼井田构造发育规律及成因机制的研究为今后矿井建设与生产提供了地质依据。
The geological conditions of strong weathering and freeze thawing in western plateau region brought an unprecedented challenge to the mine construction.
西部高原地区以其强风化、常冻融的地质条件给矿山施工带来前所未有的挑战。
The green mine construction is one kind of production pattern and its purpose is to reach the lowest affect on environment from mining industry activity.
绿色矿山建设是一种洁净生产模式,目的是使矿业活动对环境的有害影响达到最低。
Article 12 Mine construction projects must be constructed in accordance with the design papers approved by the authorities in charge of mining enterprises.
第十二条矿山建设工程必许按照管理矿山企业的主管部门批准的设计文件施工。
The acceptance check of safety evaluation for non-coal mine is one of the main basis for safety inspection and approval of non-coal mine construction project.
非煤矿山安全验收评价是矿山建设项目安全验收与审批的主要依据之一。
The mine construction technology in deep and thick alluvium associated with the practical situation of Juye Zhaolou mine are talked about and summarized in this paper.
本文结合巨野矿区赵楼矿井实际建设情况对深厚冲积层建井技术进行了探讨和总结。
The transformation scheme and the operation situation of the scheme of the transformation in Mine Construction Corporation is mainly expounded, investigated and analyzed.
第四章,阐述了太钢矿建公司的改制背景、存在问题,并对改制方案的实施情况进行了重点阐述、研究和分析。
Frozen method has more and more been used in mine construction, the influence of frost heave on construction should not be ignored. and it is very necessary to study the frost heave.
冻结法在矿山建设方面应用已越来越多,冻胀对施工的影响也不容忽视,对冻胀进行研究很有必要。
The paper, based on the analysis of digital mine definition, elaborates the main characteristics of digital mine and proposes the main contents of digital mine construction in China.
通过对数字矿山定义的分析,阐述了数字矿山的主要特征并据此提出了我国数字矿山建设的主要内容。
This paper introduces the principles of ADS40 digital aerial camera, and expounds the application of ADS40 digital aerial camera in the coal mine monitoring and the digital mine construction.
介绍了ADS40数字航摄仪的原理,阐述了ADS40数字航摄仪在煤矿监测方面和数字矿山建设方面的应用情况。
Construction of a new shaft of the mine with diameter of 8 meters was completed in 2000. The widest shaft in Russia allows to take down large equipment.
直径为8米的新竖井工程已于2000年完成,该竖井为俄罗斯最宽的竖井,可以向下运送大型设备。
To be responsible for the central administration of infrastructure construction and equipment allocation of coal mine safety supervision organs.
负责煤矿安全监察机构的基础设施建设和装备配置等归口管理工作。
In the construction process of oil and gas drilling, the joint drill wear, eccentric wear and threaded partial adhesion caused drilling damage and then evolved into the major mine accidents.
在石油天然气钻井施工过程中,常常造成钻具接头磨损、偏磨及丝扣粘连,这是引起钻具损坏进而演化为井下事故的主要原因之一。
Data Fusion of the non-structured data and structured data plays an important role in the construction of Digital Mine.
非结构化数据与结构化数据的融合是数字矿山建设的重要组成部分。
Directional drilling technique has already become a key link in long broach construction for gas drainage of the mine.
定向钻进技术已经成为煤矿井下抽放瓦斯长钻孔施工成套技术的关键环节。
Its operation practice shows that the system is well extensible and capable of providing reliable basic data for the construction of a digitalized mine.
运行情况表明,该系统具有较好的扩展性,能够为建设数字化矿山提供翔实的基础数据。
So "the mine information system construction" is chosen to be the research object of this dissertation.
为此论文选择了“矿山信息系统建设”作为研究对象。
New Shanghai One well placed mine shaft cage wellhead engineering construction company, the third Sino-Coal is responsible for installation of mechanical and electrical installation.
新上海一号井煤矿副井井口罐笼置入工程由中煤第三建设公司机电安装工程处负责安装。
New Shanghai One well placed mine shaft cage wellhead engineering construction company, the third Sino-Coal is responsible for installation of mechanical and electrical installation.
新上海一号井煤矿副井井口罐笼置入工程由中煤第三建设公司机电安装工程处负责安装。
应用推荐