4 min 30 SEC Operators observe that the water level in the primary system is rising and that the pressure is decreasing.
4分30秒操作员观察到主回路的水位在上升且压力在下降。
7 hr 30 min Even after operators pump water into the primary loop, pressure is still high. The PORV 'backup valve is opened to lower the pressure.
7小时30分钟尽管操作员已将水抽入主回路,但温度仍然很高。减压阀的备用阀门被打开,减少压力。
7 hr 30 min Even after operators pump water into the primary loop, pressure is still high.
7小时30分钟尽管操作员已将水抽入主回路,但温度仍然很高。
Wang Min (a pseudonym), a middle school teacher based in Tangshan of Hebei Province, said children should learn to budget and that part of their spending results from peer pressure.
河北省唐山市某中学教师王敏(化名)认为,现在的孩子应该要从小学习规划预算。此外,同龄人带来的压力也是他们花钱的原因之一。
Thermal of hydrostatic pressure shocks were administered 25 min post—fertilization to groups of stcelhead trout eggs.
热休克和水静压刺激在各组硬头鳟卵受精后25分钟开始施行。
Depending on the pressure p, the leakage rate through the valve is approximately 0 to 6 in3 min.
根据不同的压力P,通过阀门的泄漏率约为0六立方英寸分钟。
Depending on the pressure p, the leakage rate through the valve is approximately 0 to 6 in3 min.
根据不同的压力P,通过阀门的泄漏率约为0六立方英寸分钟。
应用推荐