The article has explained the migration process from ISA to OAT.
本文解释了从isa到oat的迁移过程。
The last step in the migration process brings you to the TAB shown in Figure 7, below.
迁移过程中的最后一步将进入如图7所示的选项卡。
As part of the migration process, you can add local interfaces to existing enterprise beans.
作为迁移过程的一部分,您可以为现有的企业bean添加本地接口。
This publication guides you through the migration process and offers several methods for migrating.
此红皮书可以在整个迁移过程为您提供指导,并为您提供几种迁移的方法。
The migration process between two clouds might be triggered by OCCI but actually also involve CDMI and OVF.
虽然两个云平台之间的迁移过程可能是由OCCI引发,但实际上也会涉及CDMI和OVF。
Simply delete the migrated model and use the backup model file that you created during the migration process.
只需要简单地删除迁移了的模型并且利用在迁移过程中您所创建的备份模型文件。
The incremental migration process begins with migration of your Version 5 deployment manager to Version 6.
增量移植过程从你的版本5 的部署管理器向版本 6 移植开始。
Shortly after the developer completes the migration process, he encounters interoperability and performance issues.
在开发人员完成迁移过程之后,他就会遇到互操作性和性能问题。
The import_attr.pl script would be delivered as part of field service to assist clients with the migration process.
import_attr . pl脚本会以域服务的一部分的形式传送,以便在迁移过程中帮助客户。
Early in your migration process, you will have to select the edition of WebSphere Studio best suited to your needs.
在迁移过程的前期,必须选择最适合需要的WebSphereStudio版本。
This is why you must have prior knowledge of the service project's structure before you start the migration process.
这就是在开始迁移流程之前您必须了解服务项目的结构的原因。
Backups at each stage of your migration enable you to rollback to a specific point in time of your migration process.
通过在迁移的每个阶段都进行备份,您可以回滚到迁移过程中的任何特定时点。
Another advantage is that the actual migration process occurs on the NIM master, taking the load off the client LPAR.
另一个优势是,实际迁移过程在NIM主机上进行,消除了客户机LPAR上的迁移负载。
Although the wizard does automate a significant part of the migration process, some manual intervention may be required.
虽然向导使很大一部分迁移过程自动化了,但还是需要一些人工干预。
The next section explains the migration process in detail. The migration process can be divided into three major phases.
下一部分详细说明了迁移的过程。
In case you choose this option by mistake and run the migration process, you can easily restore your original code model.
万一您误选这个选项并且运行迁移过程,您可以很容易地恢复您的初始代码模型。
You still had to customize many configurations manually, which is one of the most painful tasks in the migration process.
但还需要手工定制很多配置,这是迁移过程中最痛苦的任务。
Note: If you are not using UCM as your target ClearCase setup, then this may be the final step of your migration process.
注意:如果您没有使用U CM作为您的目标ClearCase创建时,那么这也许会是您的转变过程的最后一步。
In fact, code migration can be a small part of the overall migration process (this is certainly true for J2EE applications).
事实上,代码迁移可能只是整个迁移过程的一小部分(对J2EE应用而言肯定是这样)。
During the migration process, the V2.0.1 source product is the product in use, but the target V2.5 product must be deployed too.
在迁移过程中,V2.0.1源产品是在用的产品,目标V2.5产品必须也要部署。
A detailed procedure about these operations is explained in the DOORS help manual, so we will move ahead to the migration process.
在DOORS帮助手册中详细解释了关于这些操作的过程,所以我们将会继续迁移操作过程。
I'll also discuss the specific support for new features in AspectJ 5 and walk you through the migration process from AJDT 1.1.
我还将讨论对AspectJ5中新特性的特定支持,并带您经历从AJDT 1.1中进行迁移的过程。
To reiterate, the best way to mitigate the risk of unwanted packages getting to PROD is a thorough design of the migration process.
重申一下,降低不适当的包进入PROD的风险的最好方法是全面地设计迁移过程。
This article summarizes some of the major points in the migration process, and highlights some of the lessons we learned along the way.
本文总结了移植过程中的一些要点,并汇总了我们通过这次移植获得的经验。
In summary, the migration process takes a unique procedure, depending on the requirements or constraints and the source type environment.
总之,根据需求、约束以及源环境的类型,迁移过程会采取特定的步骤。
The migration process is divided into stages, primarily because different sets of skills are appropriate at various points in the process.
迁移过程被分成几个阶段,主要是因为不同的技能集适用于迁移过程的不同部分。
The legacy content was produced using many tools, each with different HTML styles, which made it difficult to use a common migration process.
遗留的内容是使用很多工具创建的,使用了不同的HTML样式,因此很难采用通用的迁移过程。
It is necessary to run the migration inside an AbstractTransactionalCommand because model elements will be modified by the migration process.
需要在AbstractTransactionalCommand中运行迁移,因为模型元素将会由迁移过程更改。
Based on experience over the years, the process Server development team has accumulated significant improvements in the V7.0 migration process.
根据多年的经验,ProcessServer开发团队在V7.0迁移过程中累积了大量的改进。
Because DB2 High Performance unload performs the loading and the unloading steps in parallel by using named pipes, the migration process is fast.
因为DB 2HighPerformance Unload使用指定管道来并行执行加载和卸载步骤,所以迁移过程非常快。
应用推荐