If instrumentation pointer have lagged behind such phenomena, unscrew the meter connector six-party nut, buffer unscrew clean, pack good again after use.
如果仪表指针出现了滞后现象等,将旋下仪表接头六方螺母,将缓冲器旋下清洗干净,装好后再进行使用。
The pointer position of the rotary vane meter is equipped with a pulse switch used for transmitting a pulse signal to the control system.
在所述的叶轮式水表的指针部位设一将脉冲信号传递给控制系统的脉冲开关。
The pointer position of the rotary vane meter is equipped with a pulse switch used for transmitting a pulse signal to the control system.
在所述的叶轮式水表的指针部位设一将脉冲信号传递给控制系统的脉冲开关。
应用推荐