Similarly, Change Control requirements should be defined in the commercial contract for supply of API Starting Materials.
在供应起始物料的合同中,应确定变更控制的有关要求。
The equipment and materials shall be unpacked and inspected at appointed places under the equipment supply contract.
设备根据设备供货合同,在指定的地点进行开箱检验。
The equipment and materials shall be unpacked and inspected at appointed places under the equipment supply contract.
设备根据设备供货合同,在指定的地点进行开箱检验。
应用推荐