• Bolting manual pillar and room method is a good future method of mining Mn ore body of medium thickness and small pitch.

    人工锚杆房一种前途开采缓倾斜锰矿床的采矿方法

    youdao

  • The formula presented in Tom 3 of "Mining Design Manual" is for approximate calculation, the area value determined from which is some less than that obtained from the formula given here.

    采矿设计手册第3卷载圆弧拱巷道断面积公式近似计算的,比本文推导公式的值稍小

    youdao

  • The formula presented in Tom 3 of "Mining Design Manual" is for approximate calculation, the area value determined from which is some less than that obtained from the formula given here.

    采矿设计手册第3卷载圆弧拱巷道断面积公式近似计算的,比本文推导公式的值稍小

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定