Saving manpower , cost , and man-hour. The output increases greatly .
节省人工、成本、工时、产量大幅度提升;
Hydraulic drive, low consumption of energy, less man-hour and high automation grade.
液压传动,耗能低,用工少,自动化程度高。
The multiplier for the estimate of man-hour costs to take care of overheads and fringe benefits.
工时成本估计的乘数及以满足福利费和经营管理费的需要。
This paper has recounted pipeline balance, man-hour quota theory, relational theory and method.
本文叙述了生产线平衡、劳动定额理论及相关的理论和方法。
The multiplier for the estimate of man-hour costs to take care of overheads and fringe benefits.
工时成本估计的乘数及以满足福利费和经营治理费的需要。
Labor standards is the lowest standards about the wages for workers, man-hour and occupation safety.
劳动标准是国家对于劳动者的工资、工时、劳动安全卫生等方面的最低限度的规定。
The system can solve dimensional linkage, calculate man-hour quota, make operation drawing, and print out t…
该系统能进行尺寸链解算,计算工时定额,绘制零件工序图,打印输出零件工序卡和工艺路线卡。
Reasoning decision strategies oriented to enterprise man-hour rationing level, is one of focus of this thesis.
推理决策的设计与实现策略面向企业级工时定额的推理决策方法是本文研究的重点。
The development environment will contribute to reduce design man-hour requirements and product development periods.
开发环境将有助于减少设计工时的要求和产品开发周期。
The system can solve dimensional linkage, calculate man-hour quota, make operation drawing, and print out the operat…
该系统能进行尺寸链解算,计算工时定额,绘制零件工序图,打印输出零件工序卡和工艺路线卡。
Taking a real project as an example, it introduces plan formulation and account settling by the mea of man-hour rating.
并通过项目实例介绍利用人工时定额编制计划、任务结算的实践。
As an important basic work in enterprise, man-hour quota standard and its balance should be the key problem to be settled.
劳动定额作为企业—项重要的基础工作,其所要解决的关键问题是工时定额水平及其平衡性问题。
It contributes to specialized Labour organization and can raise the operation proficiency and the availability of man-hour.
有利于专业化劳动组织,提高操作的熟练程度和工时利用率。
The system can solve dimensional linkage, calculate man-hour quota, make operation drawing, and print out the operation sheet…
该系统能进行尺寸链解算,计算工时定额,绘制零件工序图,打印输出零件工序卡和工艺路线卡。
The structure frame of the man-hour quota calculation and its development for the civil aviation seats manufacturing are presented.
对民航座椅工时定额制定方法进行研究,建立了工时定额系统总体结构,并提出了其实现方法。
In order to estimate the assembly man-hour of a new product reasonably, the principle and corresponding algorithms of the similar case retrieval were proposed.
为了合理地估算船舶中间产品装配作业工时,提出了产品相似实例检索规则和算法。
The system can solve dimensional linkage, calculate man-hour quota, make operation drawing, and print out the operation sheet and the process route sheet of a part.
该系统能进行尺寸链解算,计算工时定额,绘制零件工序图,打印输出零件工序卡和工艺路线卡。
The invention increases the radiation effect of motor, extends the service life of the capacitor and motor, saves man-hour, and increases the efficiency of production.
本发明提高了电机的散热效果,延长电容器和电机的使用寿命,节省了加工工时,提高了生产效率。
Design and implementation of reasoning decision strategies. Reasoning decision strategies oriented to enterprise man-hour rationing level, is one of focus of this thesis.
推理决策的设计与实现策略面向企业级工时定额的推理决策方法是本文研究的重点。
The application of HSE in Shanbei oil fields has ensured zero delay of man-hour, zero accident in the pit and zero apparatus and industrial accident in this working area.
健康安全环保(HSE)管理体系及其在陕北油田钻井中的应用,使该工区钻井达到了零误工时、无井下及设备事故以及没有工伤事故的目标。
The article confirms learning curve exists not only in the average bad rate, but also in the average man-hour, but the former progress rate is much larger than the latter.
文章不仅证实了在累计平均不良率上存在着学习效应,还证实了累计平均工时也存在着学习效应,但是前者的进步率要远大于后者。
There are many difficulties in estimating the manufacturing cost and production cycle of the die in production quoting due to the uncertainty of the man-hour of die adjusting and testing.
针对由于汽车模具调试工时难以确定所导致的制造成本和生产周期与生产实际相差较大的问题,提出了基于工时管理系统的汽车模具调试工时估计方法。
This archetype system adopted modularization framework and had the following functions: automatically designing and editing coordination charts, calculating coordination accuracy and man-hour cost.
该系统采用模块化结构,具有自动设计协调图表、编辑协调图表、协调准确度计算和统计工时成本等功能。
One man sits up in his bed for an hour each afternoon to help drain the fluid from his lungs.
男子每天下午在床上坐一个小时,以便排出肺部的液体。
On two separate morning visits to the scientists' lab, each man walked for an hour at an average speed that, in theory, should allow his body to rely mainly on fat for fuel.
在科学家的实验室里,每个人分别在上午的两次访问中,以平均速度走了一个小时,理论上,他的身体应该主要依靠脂肪作为燃料。
One hour later, the young man was back.
一个小时后,年轻人回来了。
After an hour, a man rushed through the crowd to the artist and said, "I knew you were honest and would certainly come here."
过了一个小时,一个男人穿过人群冲到艺术家面前,对他说:“我知道你是诚实的,你一定会来的。”
About half an hour later, a middle-aged man rushed to Winston in a hurry and said, "It's you!"
大约半小时后,一个中年人急急忙忙跑到温斯顿跟前说:“就是你!”
About half an hour later, a middle-aged man rushed to Winston in a hurry and said, "It's you!"
大约半小时后,一个中年人急急忙忙跑到温斯顿跟前说:“就是你!”
应用推荐