No-idle flow shop(NIFS) problem with makespan criterion is studied.
研究了以最大完工时间为目标的零空闲流水线调度问题。
The minimum time that needs to execute a batch of tasks is called makespan.
若干台处理机完成一批任务所需要的最少时间称为完工时间。
The problem of scheduling jobs with non-identical sizes on parallel batching machines is considered; the objective is to minimize the maximum completion time (makespan).
考虑并行批加工机上不同尺寸工件的调度问题;目标是极小化最大完工时间。
We discuss the nonpreemptive parallel machine scheduling problem with nonsimultaneous available time, the objective function is to minimize the makespan.
讨论任务的加工是不可中断,机器速度相同且机器具有不同开始加工时间的排序问题,目标函数是极小化最大完工时间。
This paper focuses on scheduling unit length multiprocessor tasks with de-creasing chain precedence constrains on three identical processors so as to minimize makespan.
研究三个并行处理器环境中,具有递减链约束的多处理器任务的调度问题,调度目标是最小化总处理时间,假设单项任务需单位处理时间。
This paper focuses on scheduling unit length multiprocessor tasks with de-creasing chain precedence constrains on three identical processors so as to minimize makespan.
研究三个并行处理器环境中,具有递减链约束的多处理器任务的调度问题,调度目标是最小化总处理时间,假设单项任务需单位处理时间。
应用推荐