• No-idle flow shop(NIFS) problem with makespan criterion is studied.

    研究了最大完工时间为目标的零空闲流水线调度问题

    youdao

  • The minimum time that needs to execute a batch of tasks is called makespan.

    若干台处理机完成任务需要最少时间称为完工时间。

    youdao

  • A preemptive uniform machine scheduling problem with arrival time and minimum makespan is studied in this paper.

    研究了可中断的带有到达时间的使总完工时间最小的恒排序问题

    youdao

  • We discuss the nonpreemptive parallel machine scheduling problem with nonsimultaneous available time, the objective function is to minimize the makespan.

    讨论任务的加工不可中断,机器速度相同且机器具有不同开始加工时间排序问题目标函数极小化最大完工时间

    youdao

  • This paper focuses on scheduling unit length multiprocessor tasks with de-creasing chain precedence constrains on three identical processors so as to minimize makespan.

    研究三个并行处理器环境中,具有递减约束的多处理器任务调度问题,调度目标最小化总处理时间,假设单项任务需单位处理时间

    youdao

  • The problem of scheduling jobs with non-identical sizes on parallel batching machines is considered; the objective is to minimize the maximum completion time (makespan).

    考虑并行加工机上不同尺寸工件调度问题目标极小最大完工时间。

    youdao

  • The problem of scheduling jobs with non-identical sizes on parallel batching machines is considered; the objective is to minimize the maximum completion time (makespan).

    考虑并行加工机上不同尺寸工件调度问题目标极小最大完工时间。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定