• From this early prototyping effort, two main results emerge: a qualitative assessment of whether the project is technically feasible, and quantitative measures of project schedule and cost.

    从早期的原型成果中可以得到两个结论:一个是关于这个项目的技术是否可行的定性评估,一个是项目日程表和成本的定量度量。

    youdao

  • The main purpose of the chart was for us to agree on schedule and milestones and to set up a hierarchy of work breakdown structure (WBS) items that we could track, estimate, and execute against.

    这个图表对我们的主要目的是对时间进对和里程碑达成一致,并且建立工作分解结构(work breakdown structure,WBS)的层次图,工作分解结构中的每一项我们都可以跟踪、估计和执行。

    youdao

  • A crontab line contains two main sections, a time schedule section followed by a command section.

    一个crontab行包括两个主要部分,即时间调度部分及其后接的命令部分。

    youdao

  • When having a plan, the main thing is to follow it and be sure that nothing would slip out your schedule.

    当你有一个计划,主要的事情就是按照计划进行,要确保你的日程表上没有漏掉任务。

    youdao

  • Main work contents and inspection work key point for next week, schedule drafting for group supervision next week.

    下周主要工作内容及监理工作重点,拟订下周集体巡查计划。

    youdao

  • So you should plan a brief schedule everyday before working, especially on some main things which you hope to finish.

    所以每天的工作,开始前应先拟定概略的时间表,其中特别注意希望完成的数件主要工作。

    youdao

  • Discuss the main fuzzy characteristic of production schedule and describe first, put forward controlling the method thought fuzzily of main production schedule.

    先讨论主生产计划模糊特性及其描述,提出主生产计划的模糊控制方法思想。

    youdao

  • Job Objective: Supervise the subcontractor on site, make sure the subcontractor work meet Durr standard and satisfy the main time schedule.

    职位总体目标:现场监督分包商,确保分包商安装过程符合杜尔标准及进度计划。

    youdao

  • Settlement and displacement observation influences engineerings safe and schedule directly, which is also a main part for soft ground treatment.

    沉降及位移观测是软基处理的一个重要部分,直接影响着工程的安全与进度。

    youdao

  • Firstly, cost, quality and schedule which are the main factors of engineering project management is integrated as a whole. The base of integrated management of total factors is established.

    首先,全要素成本集成管理视工程项目管理的“主要要素”——成本、进度和质量为一个整体,奠定了项目全要素集成化管理的基础。

    youdao

  • Introducesd the main revision content and the issues should be noted in the use of the new "polyethylene gas pipeline engineering Technical schedule".

    介绍了新《聚乙烯燃气管道工程技术规程》主要修改内容及使用中应注意的问题。

    youdao

  • The pass schedule is the main technological substance in plate and strip production, and is the base of calculation of the rolling mills type selection.

    轧制规程是板带生产的主要工艺技术内容,也是轧机机型选择计算的基础。

    youdao

  • As the assistant general manager, my main responsibilities are: To assist the general manager of the processing schedule, the related business negotiations, correspondence, etc.

    作为总经理助理,我的主要工作职责是:协助总经理处理工作日程安排、相关商务谈判、信函往来等工作;

    youdao

  • My main interest from the beginning was to make images from the entrance side of the building but the day after I changed my mind and added at least 2 interior images to the "schedule".

    最开始我的兴趣主要集中在制作建筑物入口处的图片,但是第二天我就改了主意,将至少两个内部图片添加到了我的计划之中。

    youdao

  • The main idea of proposed protocol was to schedule packet according to real contention status around the node and network congestion situation.

    协议的主要思想是根据节点周围实际竞争状况和网络拥塞情况进行包调度。

    youdao

  • The paper probes into the main source of the risk of virtual logistics organizations, gives out its evaluating method and puts out the countermeasures of risk schedule.

    总结了虚拟物流组织风险的主要来源,给出了虚拟物流组织风险的评估方法,并进行了应用分析,提出了虚拟物流组织的风险规划对策。

    youdao

  • The paper probes into the main source of the risk of virtual logistics organizations, gives out its evaluating method and puts out the countermeasures of risk schedule.

    总结了虚拟物流组织风险的主要来源,给出了虚拟物流组织风险的评估方法,并进行了应用分析,提出了虚拟物流组织的风险规划对策。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定