The assessment is carried out on characteristics of engineering geology in dam foundation and main engineering geology problems on arch dam and treatment measures are taken.
对该坝基础下第三系砾岩的工程地质特征及拱坝存在的主要工程地质问题进行评价,并针对其地质问题提出了工程处理措施。
Main technical measures are as follow: in construction of ecology, implementing rational disposition of engineering measures and plant measures to control soil and water loss;
其主要措施是:在生态建设方面实施工程措施和植物措施对位配置,控制水土流失;
The main measures for remanufacturing include: (1) to repair the worn, flawed parts with surface engineering technologies to recover the mechanical precision;
再制造的主要内容包括采用表面技术修复机床的磨损、划伤表面,恢复并提高机床的机械精度;
The main measures for remanufacturing include: (1) to repair the worn, flawed parts with surface engineering technologies to recover the mechanical precision;
再制造的主要内容包括采用表面技术修复机床的磨损、划伤表面,恢复并提高机床的机械精度;
应用推荐