• Start and finish on the main dam above Tai Lam Centre for Women.

    起点终点大榄女惩教所对上的主坝上。

    youdao

  • The seepage of Huojia reservoir main dam was seriously and influenced the dam safety.

    火甲水库主坝渗漏严重危及大坝安全

    youdao

  • The dam structure of main dam of Nierji Water Complex is gravel dam with asphalt concrete core wall.

    尼尔基水利枢纽工程主坝结构形式为沥青混凝土砂砾石坝

    youdao

  • Thunder strike is one of main factors of main dam safety monitor automation system being interrupted operation.

    雷击大坝安全监测自动化系统中断运行重要原因之一

    youdao

  • The author introduces the technique of cantilever turn-over formwork and gallery formwork used for Baise RCC main dam.

    介绍了百色碾压混凝土大坝悬臂翻升模板廊道模板设计和施工工艺

    youdao

  • Two special issues were studied on rockfill materials for the main dam, which was built on an inclined bedrock surface.

    针对宜兴抽水蓄能电站上库主坝倾斜基础面上的实际情况,对坝体堆石料特性进行特殊研究。

    youdao

  • Reliability is the key of main dam safety monitoring automation system, it concerned whether providing valid data for dam safety.

    可靠性大坝安全监测自动化系统成败关键关系能否大坝安全提供有效数据

    youdao

  • The construction of roller compacted asphalt concrete core wall and the transition lager and the construction of main dam body goo…

    碾压沥青混凝土以及过渡带施工主坝坝体填筑同步进行

    youdao

  • In Jiangsu Shahe Pumped-storage Power Plant, both main dam and auxiliary dam of upper reservoir are rockfill dam with concrete slab.

    江苏沙河抽水蓄能电站上水库主、副混凝土面板堆石坝

    youdao

  • The main dam of Qingfengling reservoir is designed as core shell sand dam, and some problems caused by construction material exist here.

    青峰岭水库主坝宽心墙,存在着由于筑坝材料引起的坝体质量问题

    youdao

  • Based on the data obtained from engineering geological survey, this paper evaluates and analyzes the main dam body quality of Shencun Reservoir.

    工程地质勘察所取得资料基础水库主坝坝体质量进行评析。

    youdao

  • The construction of roller compacted asphalt concrete core wall and the transition lager and the construction of main dam body go on in step with.

    碾压沥青混凝土以及过渡带施工主坝坝体填筑同步进行

    youdao

  • The main dam concrete construction is the key of the Baise WRPP main body project construction. Its working term is shorter and the construction quantity is larger.

    大坝混凝土施工百色水利枢纽主体工程施工关键,施工时间短工程量相对较大。

    youdao

  • The material of the main dam shuck is mainly the local sandy gravel. The clay core and the asphalt concrete core were compared in the choosing of seepage prevention type.

    拦河主坝坝当地材料砂砾为主防渗比较粘土墙、沥青混凝土心墙和斜墙型式

    youdao

  • Tangpu reservoir is the only source of drinking water in Yushao Plain. Its east main dam is a large concrete face-slab rockfill dam and the problem of serious seepage exists.

    汤浦水库虞绍平原目前唯一饮用水源主坝为大型混凝土面板堆石坝存在严重渗漏现象

    youdao

  • The author introduce the structure, function, feature, main technique parameters and system operation condition of the main dam security monitor system of the Chengbihe reservoir.

    介绍澄碧河水库大坝安全监测系统结构功能特点主要技术参数系统运行情况

    youdao

  • All the targets for roller compaction parameters of filling materials for the main dam and associated DAMS of the upper reservoir were determined through in situ roller compaction tests.

    通过现场碾压试验确定上库主各种填筑材料达到设计指标所需各项碾压参数指标。

    youdao

  • Kenya made its move after a recent drought that tested its dependence on hydropower, including a shutdown of its main hydro dam.

    最近干旱使肯尼亚水电的依赖受到考验,主要的水坝也关闭。

    youdao

  • One of the main sources of acrimony is Tajikistan’s long-planned construction of a dam and hydroelectric power-plant, which will provide a much-needed supply of steady electricity.

    矛盾源头主要塔吉克斯坦计划建设一个大坝以及水力发电站用以稳定提供大量的电力

    youdao

  • The main Che-Lung-Pu fault located about 300m (1000ft) away from the structure was known at the time of the design of the dam, but not the branch that ruptured under the dam.

    在这座大坝设计时,大坝300米处有一个断层当时叫作九芎坑断层。但是大坝底下一段并没有断裂

    youdao

  • Could there have been a really large dam that caused a deep lake in both Zharu and the main valleys and is older than the loess deposits?

    这儿可能一个真正巨大大坝导致峡谷之间的,并且时间黄土沉积物久远吗?

    youdao

  • Certainly, lower rainfall has cut the flow to the country's main hydroelectric dam (which provides three-fifths of its electricity) by a tenth.

    当然降雨量下滑已经减少最大水电发店站大坝(供应全国电力五分之三)十分之一流量

    youdao

  • This paper mainly introduced the pro cess, principle and main contents on revision of DL/T5178-2003Technica l Specification for Concrete Dam Safety Monitoring.

    本文叙述电力行业标准DL/T5178-2003《混凝土安全监测技术规范修订过程、修订原则修订的主要内容

    youdao

  • The paper introduced the structure, hardware, software and main functions of computer surveillance system of New dam.

    系统介绍坝船闸计算机监控系统结构硬件软件配置主要功能

    youdao

  • Firstly, according to physical character and engineering operation condition of earth dam, main invalidation modes about earth dam engineering are investigated.

    根据石坝物理特征以及工程运行实际,研究了土石坝工程的主要失效模式

    youdao

  • The main structure of the Three Gorges project consists of the water impounding dam, flood releasing installations, power plants, and navigation facilities.

    三峡水利枢纽主要拦河大坝泄洪建筑物、水电站、通航建筑物组成。

    youdao

  • Dam sluice is one of the main factors that can result in Dissolved gas Supersaturation which can cause gas bubble disease and bring threat to aquatic organisms.

    高坝泄洪导致水中气体过饱和主要因素,不仅致鱼类气泡而且水生生物带来严重的危害

    youdao

  • The present paper describes the discovering of the dam of zhengguo canal and discusses the layout of its main structure at the starting part according to archaeological data.

    本文记述了郑国渠大坝发现依据考古资料论述了郑国渠渠首枢纽工程布局,以及技术特点。

    youdao

  • The present paper describes the discovering of the dam of zhengguo canal and discusses the layout of its main structure at the starting part according to archaeological data.

    本文记述了郑国渠大坝发现依据考古资料论述了郑国渠渠首枢纽工程布局,以及技术特点。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定