On the other hand, drilling and blasting are main construction method of the underground project excavation, it can't be ignored that the vibration response of surrounding rocks on dynamical loads.
另一方面,钻爆法仍然是地下工程开挖的主要施工方法,围岩在动态荷载作用下的振动响应也是一个不可忽视的问题。
On the other hand, drilling and blasting are main construction method of the underground project excavation, it can't be ignored that the vibration response of surrounding rocks on dynamical loads.
另一方面,钻爆法仍然是地下工程开挖的主要施工方法,围岩在动态荷载作用下的振动响应也是一个不可忽视的问题。
应用推荐