The shield driving method has been one of the main construction methods in the metro engineering of our country.
盾构法已经成为我国地铁工程中一种重要的施工方法。
On the other hand, drilling and blasting are main construction method of the underground project excavation, it can't be ignored that the vibration response of surrounding rocks on dynamical loads.
另一方面,钻爆法仍然是地下工程开挖的主要施工方法,围岩在动态荷载作用下的振动响应也是一个不可忽视的问题。
Shield construction method is one of the main methods of interzone tunnel construction in urban underground.
盾构施工法是城市地铁区间隧道施工的主要方法之一。
The article introduces the reinforcement method of the main arch ring of arch bridge, presents the technical scheme of reinforcement and expounds the concrete construction method.
针对拱桥主拱圈的加固方法进行了综述,以实例说明了拱桥主拱圈加固的技术方案,介绍了如何具体施工的过程。
This paper briefs on the main design and construction schemes as well as the calculation method for the temporary supporting system cost of the bridge.
此文简要介绍了该桥的主要设计和施工方案,以及该桥临时支撑体系使用费的计算方法。
The design, calculation and construction method for cable crane system, main pylon system, fasten and hang system and anchor system are introduced respectively in this paper.
分别介绍了该缆索吊的缆索系统、主塔架系统、扣挂系统和锚固系统的设计、计算及施工方法。
NATM and shield driven method are two main kinds of underground excavation construction methods in urban metro works.
浅埋暗挖法和盾构法是城市地铁采用暗挖施工的两种主要的暗挖施工方法。
The main content of this article is the research on the theory and methods of EIS success evaluation and the construction of new evaluation system and operation method.
本文主要研究了企业信息系统成功评价的理论和方法,并以实际案例为背景进行了信息系统项目成功评价的尝试。
This essay has introduced the main characteristics of TL2000 road strengthen dose and its construction method, and its application on Chongqing Egongyan bridge's deck project.
介绍了TL2000路面强化剂主要特点和施工方法,以及在重庆鹅公岩大桥桥面工程中的成功应用。
This paper summarized the main parameter designing method of pre-stressed anchorage in coal mine and the construction technology of single sheaf resin-gluing anchorage.
本文综合介绍了矿用预应力锚索主要参数设计方法和单束树脂锚固锚索的施工工艺。
It briefly introduces the construction method for the main works of thin wall large cylinder breakwater engineering and summarizes some construction experience and matters needing attentions.
文章简要介绍薄壁大圆筒防波堤工程主要工序的施工方法,总结了一些施工经验及注意的问题。
For this reason, this paper describes the structure features of main underground powerhouse, concrete construction program and construction method.
为此,就地下主厂房系统结构特点、混凝土施工程序、施工方法进行介绍。
It gives a detailed introduction to main construction process, and analyzes the advantages and disadvantages of this method.
对车站主体各主要施工工序进行了详细阐述,并分析了该施工方法的优缺点。
The paper describes in detail the features of the closing of the main span, the construction plan and the detailed closing method and procedure.
文章详细介绍了该桥主跨跨中合龙的特点、合龙的施工方案以及具体的合龙方法和步骤。
The main methods of mucking in tunnel construction with drill and blast method is track-bound transportation system and trackless transportation.
钻爆法施工时,隧道出碴运输的主要方式为有轨运输和无轨运输。
This paper introduces the design and construction method of main bridge of the North bridge, which is a half through concrete filled steel tubular truss arch structure.
主要介绍了北门桥主桥中承式钢管混凝土提篮拱结构设计以及主要施工方法。
The main methods for the construction of tunnel are usually both the traditional drilling and blasting method and the modern method of TBM, which have their own applicable conditions concerned.
隧洞施工的主要施工方法是传统的钻爆法和现代的掘进机法,各个方法均有其不同的适用条件。
In combination with the top, meddle and bottom section features of the main coal silo, the paper studied the different anti failure technology and construction method.
结合主煤仓上中下不同地段的特点,研究了不同的抗破坏技术和施工方法。
Vertical handoff mechanism is a valid method to the question, and also one of main technical challenges to the construction of B3G.
异构网间切换技术正是解决该问题的有效方法,也是建设B3G的关键技术挑战之一。
The design thinking, main content, function characteristic and design method of using a computer-aided design system to conduct concrete construction in winter are presented in this paper.
介绍了冬季施工工艺计算机辅助设计系统的设计思想、主要内容、功能特点及设计方法。
Taking an engineering as the example, this paper introduces Slipform construction method and the main points of its quality control.
文章以某工程为例,介绍了滑模的施工方法及质量控制要点。
The main method to control crack formation is to utilize the techniques from design, construction and material, which can control the crack size within a safe scope.
裂缝控制的主要方法是通过设计、施工、材料等方面综合技术措施将裂缝控制在无害范围内。
Bracket moulding method is adopted popularly while rigidity over line arch bridge main circle construction is proceeding.
高速公路跨线刚拱桥的主拱圈施工中,一般采用支架现浇施工。
Integral lifting main body of a shield machine is a quick and simple shield machine transit method through subway stations, and can save subway station construction costs.
整体吊装盾构机主体是一种快速简便的盾构机转场通过地铁车站的方法,节约了地铁车站建设成本。
This paper introduces construction project management system software based on WBS method - CMIS, its development thoughts, main function and shortcomings.
本文介绍了基于WBS方法的工程项目管理系统软件—CM IS的开发思路、主要功能及不足之处。
This method can be used in form-finding and construction control on main cables of suspension bridge and other long-span cable structures.
该方法不仅可以应用于悬索桥主缆的找形,同样也适用于其它大跨缆索结构的找形和施工控制。
Based on this, this article has carried on the discussion to the underground composite construction dynamic performance and the underground structure design method, the main content is as follows.
基于此,本文对地下复合结构的动力计算方法和地下复合结构的动力特性进行了探讨,主要内容如下。
The construction, main technical characteristics, working principle and test method of the soft rock expansive power determinator are systematically introduced in this paper.
本文介绍了软岩膨胀力测定仪的构造、主要技术特征、工作原理和测试方法。
Of course, in constructing a large tunnel, many kinds of construction methods would be used at the same time. Here, what is said is the primary construction method of the main structure.
当然,作为建造大型隧道,会同时采用许多施工方法,这里说的是其主体结构的主要施工法。
Of course, in constructing a large tunnel, many kinds of construction methods would be used at the same time. Here, what is said is the primary construction method of the main structure.
当然,作为建造大型隧道,会同时采用许多施工方法,这里说的是其主体结构的主要施工法。