The -m option is particularly useful because it shows the network performance statistics in relation to individual CPUs.
m选项特别有用,因为它按照各个CPU显示网络性能统计数据。
The tradeoff between standardization and flexibility in system design for pavement maintenance and rehabilitation (M&R) management at network level is discussed.
探讨了网级路面养护维修管理系统设计过程中的标准化和灵活性问题。
The results show that P/M valve seats using this technology has high density and high carbon content , and their microstructure are martensite , bainite and network carbide.
结果表明,采用该工艺可获得高密度、高碳含量、具有马氏体、贝氏体和网状碳化物组织的粉末冶金气门座。
A. m evaluates delay influence on construction time by analyzing the difference between the network before delay occurrence and the network after delay occurrence.
该方法通过对某一施工延误发生前后网络状态差异的分析,来评定该延误对总工期的影响。
The method of limit is proposed for establishing the sufficient conditions for determining the direction in a ventilation network. The composite determinative m…
提出了用极限方法确定判别某些网路风流方向的充分条件,并对现有的井巷风阻复合判别法和节点位势法进行了分析和探讨。
Based on L-M algorithm of BP artificial neural network, the fractal parametric prediction model of running in and wear was established.
基于BP人工神经网络的L M算法,建立了磨合磨损的分形参数预测模型。
An improved neural network based on L-M algorithm has been applied to fault diagnosis expert system against to the slow convergence rate of conventional BP neural network.
针对传统BP神经网络训练中收敛速度较慢的缺点,提出一种基于L - M算法的神经网络应用于机械设备故障诊断的专家系统。
Also, all the plastics solution meets the demand for network cost saving, since it offers continuous runs up to 200 m without joints and does not need expansion devices.
更何况,全部采用塑料管符合节省费用的要求,因为它可以连续铺设200米而不用接头和膨胀装置。
The present situation of the connection used in electric power communication network in Jamusi place is introduced. And the superiority of popularizing 4-wire E/M connective way is analyzed.
介绍佳木斯地区电力通信网的接口运用现状,并分析了推广4 线E/M接口方式的优势。
Annex m contains the additional basic call signalling requirement for the support of private network interconnection for VPN applications.
附件M包括虚拟专用网应用中支持专用网互联的附加基本呼叫信令要求。
The traffic network composed of four lengthwise and three transverse roads has been built in the Base, including one landscape backbone road with planned overall length of 5 km and width of 35 m.
基地内已经建成四纵三横的道路网架,其中一条为规划全长5公里,宽为35米的景观主干道。
The traffic network composed of four lengthwise and three transverse roads has been built in the Base, including one landscape backbone road with planned overall length of 5 km and width of 35 m.
基地内已经建成四纵三横的道路网架,其中一条为规划全长5公里,宽为35米的景观主干道。
应用推荐