• Traditional quiet load methods of bridge test need the heavy working range, long time to load, and usually breaking down the traffic.

    传统桥梁静载检测方法工作面大,加载时间通常中断交通

    youdao

  • Furthermore the large expense and long test time of field test have become the impediments to determine the load-transfer model.

    同时,现行确定荷载传递模型大型现场试验需要花费大量时间经费。

    youdao

  • The skid bank fatigue life test of automobile transmission assembly has a long periodic time, which should go on under certain temperature and load.

    变速器总成台架疲劳寿命试验周期,并且要求一定温度载荷下进行。

    youdao

  • The skid bank fatigue life test of automobile transmission assembly has a long periodic time, which should go on under certain temperature and load.

    变速器总成台架疲劳寿命试验周期,并且要求一定温度载荷下进行。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定