• Is there a line plan or production loading schedule for at least one month in advance?

    至少有最近一个月的生产计划或生产通知单?

    youdao

  • By Analyzing the economy for consolidation and the strength of soft clay during consolidation, the optimal design of the parameters of sand well and the loading schedule (project term) is proposed.

    经过排水固结法的经济分析及软土排水固结过程中的强度分析,提出了砂井参数及加载计划(工期)的优化设计方法。

    youdao

  • By Analyzing the economy for consolidation and the strength of soft clay during consolidation, the optimal design of the parameters of sand well and the loading schedule (project term) is proposed.

    经过排水固结法的经济分析及软土排水固结过程中的强度分析,提出了砂井参数及加载计划(工期)的优化设计方法。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定