The initial core loading program, nuclear safety and nuclear monitoring during the core loading and temporary instrumentation system for Qinshan NPP is described.
本文介绍秦山核电厂首次装料程序、装料中的核安全与核监测,以及装料试验用的临时核测仪表和设备。
Testing purpose, model design principle, testing case, loading program, strain and deformation test point arrangement of the first Zhongshan Bridge test model are introduced in detail.
介绍了该桥模型试验的目的、模型设计原则、测试工况、加载方案以及应变和变形测点布置情况等,给出了几个主要荷载工况下模型试验的主要结果。
The testing purpose, model design principle, testing case, loading program, strain and arrangement of deformation test point of the special-shaped arch bridge test model are introduced in detail.
介绍了该桥模型试验的目的、模型设计原则、测试工况、加载方案以及应变和变形测点布置情况等,给出了几个主要荷载工况下模型试验的主要结果。
The testing purpose, model design principle, testing case, loading program, strain and arrangement of deformation test point of the special-shaped arch bridge test model are introduced in detail.
介绍了该桥模型试验的目的、模型设计原则、测试工况、加载方案以及应变和变形测点布置情况等,给出了几个主要荷载工况下模型试验的主要结果。
应用推荐