Apply150% rated load at rated power factor and measure the time required for the inverter protective devices to operate.
在额定功率因素上施加150%额定负荷,并测量逆变器保护装置启动所需时间。
The result indicates that the maximum of dynamical stress intensity factor arrives behind the load time and increases with the size of thick wall cylinder.
结果表明动态应力强度因子的最大值在加载时间上有滞后性现象,它的最大值随厚壁筒尺寸增加而增加。
The hourly average daily generation curve is used to express the wind farm operation constraint and the load changes over time are reflected through the scaling factor.
该模型中通过比例因子来反映负荷随时间的变化,采用日平均发电曲线表示风电场的运行约束。
There are a lot of factors which affect dynamic load of the belt conveyors, and the smooth starting time is a improtance factor.
分析了带有液体粘性传动装置的长距离带式输送机,在软起动过程中起动时间的长短对振动载荷的影响。
Parallel processing can decrease the response time of military information system; load unbalance is an important factor that lowers the performance of parallel processing system.
并行处理能缩减军事信息系统的响应时间,而负载失衡是降低并行处理系统性能的重要因素。
Based on that, the formulae of lithology factor and time factor of load transmitting were established. By means of these formulae, the problem of load calculation for roof key block can be solved.
提出了载荷传递因子的概念,给出了卸荷拱高度的计算公式和载荷传递因子的计算公式,解决了关键块上的载荷计算问题。
At the same time, constitute a capacitive load, so that capacitive power factor of 0.2 to a minimum the following, non-harmonic and electromagnetic interference, the true green light source.
同时,构成电容性负载,使容性功率因数降至最小0.2以下,无谐波和电磁干扰,真正的绿色光源。
Generally, the default load factor (. 75) offers a good tradeoff between time and space costs.
一般而言,默认的加载因子0.75在时间和空间的开销上给出了一个较好的折衷。
Generally, the default load factor (. 75) offers a good tradeoff between time and space costs.
一般而言,默认的加载因子0.75在时间和空间的开销上给出了一个较好的折衷。
应用推荐