In the process of structure construction, the structural system, boundary constraint conditions and load distribution are constantly changing.
在结构施工过程中,结构受力体系、边界约束条件、荷载分布在不断的改变。
By analyzing the structural theory calculation, make sure the bridge dead load experiment plan, elaborate the experimental preparation, implementation process and the effect.
通过结构理论计算分析,确定该桥静载试验方案,阐述试验准备、实施过程及所取得效果。
In the design, in construction process of the structural calculation of the upper part in the continuous bridge, the permanent load were simulated and calculated.
在设计中,桥梁上部结构的计算着重分析了桥梁在施工过程中,恒载内力的计算。
Lithology, rock stratum thickness, fracture process, structural stress field, local structure, stratum load and karst process are all main controlling factors for the development of the rift.
岩性、岩层厚度、断裂作用、构造应力场、局部构造、地层负荷与岩溶作用是控制裂缝发育的主要因素。
Lithology, rock stratum thickness, fracture process, structural stress field, local structure, stratum load and karst process are all main controlling factors for the development of the rift.
岩性、岩层厚度、断裂作用、构造应力场、局部构造、地层负荷与岩溶作用是控制裂缝发育的主要因素。
应用推荐