The TDMLoad stage supports both data load and export.
TDMLoad工作台支持数据加载和导出。
Teradata load stage - provides a bulk data load solution that USES the Teradata FastLoad utility.
TeradataLoad工作台—提供了一个使用teradataFastLoad实用工具的批量数据加载解决方案。
Figure 31 shows the stage definition for the Teradata load stage when the stage is used to load data into a database table.
图31展示了Teradata Load工作台用于将数据加载到数据库表中时的工作台定义。
You can skip straight back to each stage later on by going to 'load stage' in the main menu and entering the 6-digit level code. Enjoy!
你能够在主菜单的“载入游戏”里输入这个6位数的密码,直接跳到密码对应的关卡。
Figure 29 shows how to set up the TDMLoad data load operation. The following describes how the TDMLoad stage works for the data load operation.
图29展示了如何设置TDMLOAD数据加载操作。
Stage Two freighter could carry itself, with an empty mass of 500 tons, to Uranus in 70 days for just 114 tons of fuel, and then bring back a load of 614 tons using about 254 tons of fuel.
一个第二阶段的货轮本身,具有500吨的空量,在去天王星70天里仅114吨的燃料,然后带回了614吨负载使用约254吨燃料。
The stage 2 loaders used in LILO and GRUB allow you to choose from several operating systems or versions to load.
LILO和GRUB中使用的阶段2加载程序允许从几个操作系统或版本中选择其中之一。
At this stage we focused on function tests (including GUI tests), although we also carried out some early load tests.
在项目的这个阶段,我们主要关注在功能测试(包括GUI测试)上,虽然我们也从事了一些早期的负载测试。
The job of the primary boot loader is to find and load the secondary boot loader (stage 2).
主引导加载程序的工作是查找并加载次引导加载程序(第二阶段)。
The task at this stage is to load the Linux kernel and optional initial RAM disk.
这个阶段的任务是加载Linux内核和可选的初始ram磁盘。
The Teradata Enterprise stage uses the FastLoad protocol to load data into a table.
TeradataEnterprise 工作台使用 FastLoad协议将数据加载到表中。
Then you can load columns for the "XML_FOLDER" stage, adopting the build-in table definition "Folder," as shown in Figure 23.
然后可以采用内置的表定义“FOLDER”装载用于“XML_FOLDER”stage的列,如图23所示。
This boot loader is less than 512 bytes in length (a single sector), and its job is to load the second-stage boot loader.
这个引导加载程序在大小上小于512字节(一个扇区),其作用是加载第二阶段的引导加载程序。
The first stage consists of a simple boot loader (found on the boot device's master boot record, or MBR), whose job is to load the second-stage boot loader.
第一阶段包含了一个简单的引导加载程序(这可以在引导设备的主引导记录MBR中找到),其作用是加载第二阶段的引导加载程序。
The kernel then mounts this initrd as part of the two-stage boot process to load the modules to make the real file systems available and get at the real root file system.
内核然后会将这个initrd文件作为其两阶段引导过程的一部分来加载模块,这样才能稍后使用真正的文件系统,并挂载实际的根文件系统。
Teradata Enterprise stage - a parallel bulk data load and export solution using multiple FastLoad and FastExport sessions.
TeradataEnterprise工作台—使用多个FastLoad和FastExport会话的并行批量数据加载和导出解决方案。
The stage generates a Teradata load utility script and then invokes the Teradata MultiLoad or TPump utility based on the user selection.
工作台将生成一个teradata加载实用工具脚本,然后根据用户选择调用teradataMultiLoad或者TPump实用工具。
Besides the research and calculation materials for the stage of working load, the complete moment-curvature curve and the calculation of ultimate deformations are provided too.
除对使用荷载阶段进行研究和给出计算的结果外,也给出弯矩-曲率全曲线和极限变形的计算。
The completed experiment of this product consisted of five stage production testing, cold state testing, load testing, auto regulation testing.
本产品复杂试验由生产测试、冷态试验、负荷试验、自动调试和用户调试这五大阶段组成。
The shortness of creep loading time and the faster frequency of fatigue load change induce general elastic strain stage to end and delayed elastic strain platform stage to begin under shorter strain.
因蠕变加载作用时间缩短和疲劳载荷变化更频繁,导致在较小的应变下结束普弹应变阶段并进入延迟弹性变形的平台应变阶段。
The delayed elastic deformation stage came later, the bend deflection increased more quickly, and breaking life shortened with the increase of the prolongation of the maximum load hold time.
随着最大载荷保持时间的增加,塑木复合材料进入延迟弹性变形阶段越晚,弯曲挠度增加越快,断裂寿命降低。
The process integrates a desulfurization procedure into the gasification stage, thereby reducing the load of a downstream purification procedure.
本工艺将脱硫工序整合在气化阶段,以减轻下游净化工序的负荷。
In view of fast continual outage stage, a continual fault evolution model used to study cascading outages for electric transmission equipment's over load was proposed.
针对连锁故障快速相继开断阶段,提出了用于研究输电设备过负荷连锁跳闸问题的相继故障演变模型。
Corrosion fatigue damage of concrete is the coupling action result of corrosion medium and load fatigue, and the study on this has been in the stage of theory search.
混凝土腐蚀疲劳破坏是腐蚀介质与交变荷载耦合作用的结果,对其研究目前国内外还仅处于理论探索阶段。
How to offer the application service in the fields of part load freight transportation enterprise based on ASP model are still at the stage of exploration.
而如何利用ASP模式为零担快运企业提供应用服务目前还处于探索阶段。
Furthermore, at the elastic stage, relationship between the bending deformation and shear deformation of test model under the inter-concentrated load was showed.
并就弹性阶段,得到了试验梁跨中作用集中荷载时,弯曲挠度与剪切挠度之间的相对增长关系。
At the stage of technical design, transverse load distribution can be calculated according to the specified dimensions of the structure.
在技术设计阶段,可以根据具体结构尺寸进行计算。
A two stage emergency load shedding algorithm was developed to ensure safe control along with economic operation.
为确保校正控制的安全性同时兼顾经济性,提出一种新的紧急切负荷算法。
When a small system is in on-load operation in the early stage of black start, unit paralleling may fail due to reverse power protection.
黑启动初始阶段,小系统空载运行的情况下,由于逆功率保护而往往发生机组并车失败问题。
When a small system is in on-load operation in the early stage of black start, unit paralleling may fail due to reverse power protection.
黑启动初始阶段,小系统空载运行的情况下,由于逆功率保护而往往发生机组并车失败问题。
应用推荐