On June 3rd, the temperature in Lingao reached 41.9℃.
6月3日,临高的气温到达了41.9℃。
The dam of Lingao Reservoir is a rolled earth dam with relative height and the secondary importance grade.
岭澳水库土坝是一座较高的碾压式土石坝,为二级建筑物。
Abstract: CPR1000 technique is based on the mature design of Dayabay and LingAo Phase 1 NPP, and is being applied for over 10 in-building units.
摘要:CPR 1000技术方案是基于大亚湾和岭澳一期核电厂的成熟设计,目前有10台在建机组采用该技术方案。
Abstract: CPR1000 technique is based on the mature design of Dayabay and LingAo Phase 1 NPP, and is being applied for over 10 in-building units.
摘要:CPR 1000技术方案是基于大亚湾和岭澳一期核电厂的成熟设计,目前有10台在建机组采用该技术方案。
应用推荐