• In introducing gray programming and fuzzy linear programming into the scope of management project of construction machinery, various programming problems in engineering can be solved.

    灰色线性规划模糊线性规划引入工程机械管理规划领域可以基本解决工程实际中的各种规划问题

    youdao

  • Based on its soil and water loss and treatment characteristic, the monitoring technology of linear zone development and construction project was elaborated from its content, object, item and method.

    针对线形开发建设项目水土流失治理特点监测内容对象到监测项目和方法,线形开发建设项目水土保持监测技术进行了详细地阐述。

    youdao

  • Based on its soil and water loss and treatment characteristic, the monitoring technology of linear zone development and construction project was elaborated from its content, object, item and method.

    针对线形开发建设项目水土流失治理特点监测内容对象到监测项目和方法,线形开发建设项目水土保持监测技术进行了详细地阐述。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定