• WC43 series leveler is integral lifting roller leveler with many top rolls.

    WC43系列矫平整体升降式的辊式矫平机。

    youdao

  • A conveyance roller way lifting device is arranged between the lifting device mounting plate and the conveyance roller way.

    所述升降装置固定传送辊道之间设置有传送辊道升降装置。

    youdao

  • Lifting operation hydraulic system should be no-load operation, adjust the lifting sleeve frame roller and the mast section clearance, hoisting torque and balance torque balance;

    作业液压系统进行空载运转调整顶升滚轮塔身标准间隙使起重力矩平衡力矩保持平衡;

    youdao

  • Pneumatic lifting drying channel and operating platform for web stretch, active synchronous running leading roller inside drying channel.

    顶式烘箱穿膜操作平台,烘箱主动同步运转

    youdao

  • Then the lifting mechanism resets, the upper edge of the conveyer belt falls down, and the rear glass can continue to run forward on the main roller-way.

    然后升降机构复位输送皮带上边落下后面玻璃辊道继续向前运行

    youdao

  • Then the lifting mechanism resets, the upper edge of the conveyer belt falls down, and the rear glass can continue to run forward on the main roller-way.

    然后升降机构复位输送皮带上边落下后面玻璃辊道继续向前运行

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定