• During construction of aircraft hangar gate, lifting is the most important segment although it requires the shortest time.

    机库大门整个建造过程吊装环节虽然所需时间最短,但却是至关重要的一环。

    youdao

  • On the one hand, Design the physical structure of beam-type ship draft testing gate, On the other hand, Focuses on the detection of synchronous lifting the door control system.

    一方面给出了检测物理结构设计一方面重点研究检测门的同步升降控制系统

    youdao

  • The paper establishes the mathematical model for auto-lifting process of the over hang-gate machine in Shanxia.

    建立了三峡高架门机自过程数学模型

    youdao

  • The paper establishes the mathematical model for auto-lifting process of the over hang-gate machine in Shanxia.

    建立了三峡高架门机自过程数学模型

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定