-
The left training wall of TGP is situated downstream of the transition dam section between spillway and left intake dam.
左导墙位于泄洪坝段与左厂房坝段之间的导墙坝段下游。
youdao
-
The left training wall of TGP is situated downstream of the transition dam section between spillway and left intake dam.
左导墙位于泄洪坝段与左厂房坝段之间的导墙坝段下游。
youdao