The four phases implementing the fourth generation port were suggested, including port business processes reengineering phase, JIT phase, lean phase and agile phase.
给出了实施第四代港口的四个阶段,即:港口作业流程再造阶段、准时化阶段、精细化阶段和从精细到敏捷的阶段。
Dilute (lean), dense and two phase vacuum conveying systems High and low pressure conveying systems Conveyor systems for bulk solids, powders and other granular materials.
稀释(倾斜的),密集的和两相真空运输系统高压和低压运输系统该设备用于输送散装固体,粉末和其他的粒状材料。
The major goal in Lean Acceptance Phase is to create the Lean culture at shop floor employees.
在精益接受阶段,主要的目标是在车间的员工中营造精益的文化。
Obviously, Lean Sigma project management provides more key elements for project executions. Let look at more details of each phase of Lean Sigma project management practices.
很显然,精益西格玛项目管理对于项目的执行提供了更多的关键因素。让我们来看看精益西格玛项目管理实施的更多细节。
Congratulation if you have followed these 3 phases and your organization should achieve continuous improvement culture that key leverage for more Lean transformation next in phase 4.
如果你把这3个阶段都进行下来了,那么恭喜!你的企业也应该建立起了持续改善的文化,并且为接下来的第4阶段中更多的精益改善做好了关键的支架。
In Lean Fundamental Set-up phase, the operational director or at least the production manager should be fully engaged.
在精益的基础建设阶段(第二阶段),应该有一位操作总监参与进来,或者至少是一位生产经理参与进来。
In Lean Fundamental Set-up phase, the operational director or at least the production manager should be fully engaged.
在精益的基础建设阶段(第二阶段),应该有一位操作总监参与进来,或者至少是一位生产经理参与进来。
应用推荐