• Problems of selection of raw materials and layout of equipment and process bewared in design of resin-bonded sand shops are introduced and rationalization proposal set forth.

    介绍了树脂砂车间工艺设计中选择原材料、设备和工艺布局时应注意的问题,并提出了一些合理化建议。

    youdao

  • The box girder concrete casting key point, layout of equipment and casting time control are analyzed on the base of construction performance of high quality maritime works concrete.

    在研究高性能海工混凝土的施工性能的基础上,分析了箱梁混凝土浇筑关键点、设备配置和浇筑时间控制等。

    youdao

  • The box girder concrete casting key point, layout of equipment and casting time control are analyzed on the base of construction performance of high quality maritime works concrete.

    在研究高性能海工混凝土的施工性能的基础上,分析了箱梁混凝土浇筑关键点、设备配置和浇筑时间控制等。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定