On the other hand, connector is one of key factors for ensuring that steel lattice grid and concrete slab can work together.
另一方面,连接件是钢网架与混凝土板能够共同工作的关键因素之一。
The diagonal double pitch curved lattice grid system is used in the country for the first time.
斜拉双坡曲面钢网壳结构体系,为国内首次采用。
The diagonal double pitch curved lattice grid system is used in the country for the first time.
斜拉双坡曲面钢网壳结构体系,为国内首次采用。
应用推荐