• Large-scale wind power generators connecting to power grid increases the risk of day-ahead scheduling, meanwhile, the risk control could bring a small increase of coal consumption of the system.

    电机大规模并网增加日前调度风险同时对这种风险进行控制使系统的煤耗少量提高

    youdao

  • Large-scale wind power generators connecting to power grid increases the risk of day-ahead scheduling, meanwhile, the risk control could bring a small increase of coal consumption of the system.

    电机大规模并网增加日前调度风险同时对这种风险进行控制使系统的煤耗少量提高

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定