A method to study the behavior of axially loaded large diameter piles according to insitu static load test of an instrumented pile and theoretical analysis is presented.
提出了一个现场静载试验与理论分析相结合确定大直径桩竖向承载性能的方法。
This paper discusses the importance of examine large diameter pile hole, analyzes current examining methods and problem of large diameter pile hole and puts forward methods to solve the problem.
阐述了大口径检测的重要意义,分析了目前大口径质量检测的方法和存在的问题,并指出了解决这些问题的方法和途径。
The bearing characteristic of large diameter and super-long pile in quaternary soil layer is analyzed in the case of no good bearing layer (such as rock, sand and cobble layer) and no ripe experience.
在没有良好的持力层(基岩或砂、卵石层)和成熟经验可借鉴的情况下,对第四系土层大直径超长桩(钻孔灌注桩)的承载特性进行了分析。
The way to value the bearing capacity and settlement calculation given herein are fit for the design of large diameter belled pile in China.
文中提出的承载力取值和沉降计算是一套适合于我国大直径扩底桩的设计方法。
The applications of large diameter manual hole digging pile in different engineering geological conditions are discussed based upon design examples.
通过设计实例,从理论上探讨了大直径人工挖孔桩在建筑基础设计中的应用。
The content intends to solve the problem of lateral pressure at the walls of large diameter squat silos, especially the problem of overcharge caused by the top pile material.
这部分内容意在解决大直径浅圆仓仓壁上的水平侧压力的计算问题,合理地解决了仓壁顶面以上的料堆引起的超压问题。
Since deep penetration large diameter steel pipe piles have been widely used in platform foundation, pile drivability analysis and blow count prediction play an important role in pipe driving.
大直径超长桩的出现给海上的打桩施工增加了难度和复杂性,也使得打桩分析和预估锤击数具有重要的意义。
An introduction is given to sinking technology for large diameter prestressed high strength tubular pile, and issues for consideration during sinking and treatment of problems encountered.
介绍大直径预应力高强度管桩的沉桩技术,以及沉桩过程中的注意事项和问题处理。
Since few static tests are carried out to determine the capacity of large - diameter concrete pipe pile, dynamic pile test method is widely used to determine its bearing capacity.
在缺少大直径混凝土管桩静载试验的情况下,现在普遍采用了动测试桩的方法确定大管桩承载力。
The current standard mainly establishes at the aim of short intermediate pile, the design method of the long and large diameter bored piles is less targeted and its applicability is not wide.
当前的规范主要是针对中短桩建立而成的,对于超长大直径钻孔灌注桩的设计,其针对性不强,存在适应性问题。
Therefore, it is feasible to analyze the bearing capacity of a large diameter single pile by three parameters load transfer function model of pile body and pile top and numerical iteration method.
说明文章提出的方法对计算大直径单桩的荷载与沉降曲线具有较好的适用性,利用桩身和桩端的三参数荷载传递函数模型和迭代算法分析大直径单桩的承载性状是可行的。
Large diameter bulb pile constructed by manual excavation has many advantages, such as high bearing capacity, direct load transfer, and little settlement on proper geological conditions.
人工挖孔大直径扩底桩具有承载能力高,结构传力简明,地质条件合适时沉降小等优点。
Construction technology and quality control of large diameter super-deep bored pile under complex geological condition are introduced.
介绍在复杂地质情况下超深大孔径桩基施工技术和质量控制措施。
The pile cutoff and tbe shrinking-diameter piles are discovered and numbered in rather large proportion.
用反射波法对该柱基进行了质量检测,发现断桩、缩径桩比例较大。
Construction technique of large diameter hollow pile was analyzed. Through the MARC program, large diameter hollow pile was analyzed with simulation method.
分析了大直径空心桩的施工特点,利用MARC软件,对大直径空心桩这一新型基础进行了数值仿真。
The large diameter manpower excavation pile is used widely in project for its high bearing capacity, reliable quality and easy construction.
大直径人工挖孔桩具有单桩承载力高,质量容易保证,容易于施工等优点,在工程中已得到日益广泛的应用。
In the complex soft layer contained large quantity of living rubbish, construction on sinking tubular pile with conventional method, will lead on to reduce tube diameter.
在含有大量生活垃圾形成的复杂软弱层中,按常规方法施工沉管桩,将造成严重的缩径现象。
The bearing capacity of super-long and large-diameter bored pile tip is influenced by the facts including construction process, depth effect, size effect and so on.
阐述了超长大直径钻孔灌注桩桩端承载力的影响因素,包括施工工艺、深度效应和尺寸效应等。
The numerical simulation method based on software FLAC3D for the large-diameter long pile is discussed, and the influences of parameters of soil-pile interface on the numerical results are analyzed.
基于FLAC3D数值分析软件,探讨了大直径长桩的数值模拟方法,分析了桩土间接触面参数对数值计算结果的影响。
The entering-rock problem of pouring pile through large-diameter hole drilling is always the biggest difficult problem in the fundamental construction of Guangxi.
大口径钻孔灌注桩的入岩问题,历来是广西基础施工中的一大难题。
Effects of grouting on the bearing behavior of bored pile are analyzed with the finite element method in accordance with the test results of large diameter over length piles.
结合大直径超长桩试桩得到的试验资料,应用有限元方法分析了压浆对大直径超长钻孔灌注桩承载性能的影响。
A modified three-dimensional plastic limit analysis method is proposed for lateral bearing capacity of the large-diameter pipe pile in the inhomogeneous and anisotropic soft ground.
对于非均质各向异性软土地基上管桩基础的承载力,基于塑性极限分析理论考虑软土强度的非均质与各向异性效应,提出了一种改进的三维极限分析上限解法。
Sutong Bridge located in the tidal reach adopts the pile-group foundation with large-diameter and over-length bored piles working with the steel casing together.
位于潮汐河段的苏通大桥采用大直径、超长钻孔灌注群桩基础,而且需要考虑钢护筒的共同作用。
The research on the operating technology and load transfer mechanism of super long-large diameter bored pile;
通过土钉抗拔力学模型探讨了高压注浆土钉的抗拔荷载传递机理,简单介绍了其施工工艺。
The research on the operating technology and load transfer mechanism of super long-large diameter bored pile;
通过土钉抗拔力学模型探讨了高压注浆土钉的抗拔荷载传递机理,简单介绍了其施工工艺。