A kind of randomness test on key schedule algorithm of block ciphers is designed.
计划了一种关于分组暗码密钥编排算法的随机性检测要领。
From the answers to the questionnaire, identify areas for further information requirements and schedule follow-up interviews with key personnel.
从问卷答案中,确定进一步的信息需求领域,并计划安排与重要人员的后续访谈。
An estimate is a key element of the project plan and schedule, and the consequences of poor estimating are failed projects.
评估是项目计划和安排的一个重要组成部分,评估不当的结果就是项目失败。
The key is to schedule things in moderation and choose activities with a child's age, temperament, interests, and abilities in mind.
按照孩子的年龄,性格,兴趣和思考能力来安排一些适量的事情及挑选活动是个关键点。
A key meeting I conduct on all of my projects is an issue, risk, and detailed project schedule review meeting.
我曾针对自己的所有项目召开过一次很关键的会议,是关于问题、风险、项目进程明细表的回顾会议。
The final schedule is now online and features 103 speakers and 107 sessions on key topics designed for senior developers, team leads, architects in enterprise software development shops.
现在大家可以在线查看最终的议程,本次大会共有103位演讲人、107个主题,面向企业软件开发领域的高级开发者、团队领导及架构师。
But now that many bloggers have morphed into small-media business owners, they are starting to feel pressure to follow a schedule and cover key news stories.
但是,现在很多博客正逐渐转变为小型媒体,开始面临时间表和重大新闻报道的压力。
Similarly, assume that Mark accepts the proposed new time, but before he reschedules the meeting, he can click Check schedule to view the free times for all his key individuals (see figure 5).
与之类似,假设Mark接受了提议的新时间,但是在重新安排会议之前,他可以单击CheckSchedule查看所有关键参与者的空闲时间(见图5)。
This forum helps key members of the COE gain visibility as having the requisite knowledge and expertise to make the right choices for Acme. Here's an example schedule for such a forum.
该座谈会帮助COE的重要成员获得可见性,从而使他们具备为Acme做出正确决策所必备的知识和专业技术。
The vesting schedule of the program is designed in such a way to retain key talents.
该政策的解冻时间表是按照关键员工保留的目的设计的。
Manufacturing status is established during production meetings to identify key date activities based upon the production schedule.
生产会议将确定生产状态,根据生产进度时间表确立关键日活动。
The key to JIT operations is that the demand for components and materials depends on the finalized production schedule.
准时制作业的关键是对配件和物料的需求根据最终生产进度来决定。
The purpose of the schedule of expected key controls is to assist in the evaluation of the actual controls identified during the audit.
预计的关键控制表的目的是为了在审计过程中辅助评价实际存在的控制程序。
Main work contents and inspection work key point for next week, schedule drafting for group supervision next week.
下周主要工作内容及监理工作重点,拟订下周集体巡查计划。
It's hard to stay focused once the day gets started, so it is key to schedule a few minutes a day to just be quiet and focus on what needs to be done.
新的一天开始后,人们很难保持专注,所以,每天用几分钟时间让自己保持平静,专心思考需要完成的任务,便显得尤为关键。
Core data exchange area improves the presence of platform core data and also is the key to transaction schedule.
核心数据交换区技术增强了平台核心数据的表现形式,同时也是解决交易调度的关键。
The installation quality of the air-cooling island, which is a turn-key project of Shenmu Yangguang Power Plant, is very important, and its schedule control is also very complicated.
陕西神木阳光电厂工程空冷岛的安装质量控制主要是保证焊缝的施工质量和风机找平对中的质量,进度控制就是确保施工节点不变。
In the control of construction schedule for hydropower projects, risk analysis of the schedule is a key.
工程施工进度风险分析计算是施工进度控制中的重要环节。
Thee key to JIT operations is that the demand for components and materials depends on the finalized production schedule.
准时制作业的关键是对配件和物料的需求根据最终生产进度来决定。
The key might not be to try to contort yourself into a schedule that doesn't work for you, but to experiment.
关键不是强行让自己适应不适合自己的作息时间表,而是去尝试。
Careers, like rockets, don't always take LFF on schedule. The key is to keep working on the engines.
事业就像火箭并非总是依时升空。关键是始终保持动力。
Template processes in many cases network diagram of the construction of the key lines, Process Improvement template can often speed up the construction schedule.
模板工序在许多情况下是施工网络图中的关键线路,模板工艺的改进常常可以加快施工进度。
Here, different developing hierarchies and its corresponding key technology are discussed emphatically: visual-project management, task schedule, workflow control and conflict settlement etc.
重点讨论了协同工作支持环境相应的关键技术:项目管理、任务规划、工作流控制、冲突解决等技术。
In the parallel test System, the testing programs are to compete for instruments concurrently. Therefore, how to allocate instruments and schedule task is a key to parallel test.
在并行自动化测试系统中,并发执行的多个测试程序会竞争有限的仪器资源,硬件资源的分配与任务调度是并行测试的一个关键问题。
Therefore, it has strong realistic meaning and a certain theory value to study on construction-schedule early-warning model of waterlocks key project.
因此,水闸枢纽工程施工进度预警模型研究具有很强的现实意义和一定的理论价值。
In the meantime, the key technology is of the MIS are studied which include order management, production schedule, capacity requirement planning and resource loads balancing.
同时,讨论了管理信息系统的几个关键技术,包括订单管理的优化排产技术,生产能力和能力需求计划与负荷平衡技术。
Inadequate irrigation schedule is not only the key for deficit irrigation, but also the basis for optimal allocation of agricultural water resources.
最优灌溉制度是实行非充分灌溉的关键问题之一,同时也是非充分灌溉条件下灌溉水量时、空优化分配的基础。
The dissertation also applies schedule early-warning model to the DS waterlocks key project, gives the sign value of schedule points, provides risk handling with theory foundation accordingly.
论文将进度预警模型应用于DS水闸枢纽工程,给出了进度点的警情值,从而为风险应对提供了理论依据。
The dissertation also applies schedule early-warning model to the DS waterlocks key project, gives the sign value of schedule points, provides risk handling with theory foundation accordingly.
论文将进度预警模型应用于DS水闸枢纽工程,给出了进度点的警情值,从而为风险应对提供了理论依据。
应用推荐