• Hoover Dam provided the two key ingredients - water and power - that freed the Southwest and southern California to go on a 75-year growth spurt.

    胡佛水坝提供了两种关键成分使加州西南部南部实现了75井喷增长

    youdao

  • Establishing an interpretative model evaluating dam behaviour is the key to realization of automated dam safety monitoring.

    建立大坝性状解释性模型实现监测自动化关键

    youdao

  • A dam safety monitoring is understanding of the dam behaviour, and it is a key link to en-sure the dam safety.

    大坝安全监测了解大坝运行性态,保证大坝安全的重要环节

    youdao

  • Liantuo Bridge is one of the key works on the special highway leading the Three Gorges Dam Project to the outside.

    特大三峡工程对外交通专用公路重点工程之一

    youdao

  • Reliability is the key of main dam safety monitoring automation system, it concerned whether providing valid data for dam safety.

    可靠性大坝安全监测自动化系统成败关键关系能否大坝安全提供有效数据

    youdao

  • There are 8 key shoals and 7 normal shoals at downstream of the dam of the Three Gorges Reservoir.

    三峡水库下航道8重点浅滩7一般碍航浅滩。

    youdao

  • The TGPs third stage river closure is a key works for the early stage cofferdam supported power generation and guarantee of the successive construction of hydroelectric plant and dam at right bank.

    三峡工程第三截流工程确保实现初期围堰挡水发电同时修建右岸大坝电厂关键性工程。

    youdao

  • Under complex geological condition, drilling quality is the key factor that will decide the success of observation and measurement system of the dam.

    复杂地质条件下钻孔质量影响大坝监测系统成败关键

    youdao

  • The Shuibuya hydroelectric project will be built in gorge morphology on Qingjang River, the gravitation is key factor which decides whether the rock in dam site is stable or not.

    水布垭水电枢纽拟建于清江干流深切峡谷地段,重力决定坝址区岩体稳定与否关键因素

    youdao

  • A certain reservoir dam spillway slope stability and affect the normal operation of the reservoir storage key projects.

    水库工程溢洪道边坡影响大坝稳定蓄水后水库正常运行关键工程

    youdao

  • The key link of embankment dam construction is fil ling and compacting of earth and rock materials and the compaction quality depends on whether the compacting standard is properly executed.

    土石坝施工核心石料的填筑压质量的好坏,关键在于能否正确执行压实标准

    youdao

  • The study of deformation characteristics for rockfill materials is one of the key tasks in the design of high concrete faced rockfill dam.

    筑坝材料变形特性研究面板堆石坝设计工作中的关键工作之一

    youdao

  • The reliability of seepage prevention system is a key problem for high rockfill dam built on the foundation of large overburden depth.

    覆盖地基修建石坝,其防渗体系可靠性一项关键技术问题

    youdao

  • It is important to safely and economically solve flood discharge and energy dissipation during the course of the key layout of high concrete dam hydro-junction.

    混凝土枢纽布置安全经济地解决枢纽泄洪能问题对于枢纽布置重要意义

    youdao

  • Credible dynamic parameters of dam materials obtained from indoor tests are the key to the accuracy of dynamical analysis for earth-rock dam.

    室内动力试验提供土石料可靠动强度和动力参数土石坝地震动力分析准确性关键

    youdao

  • The key technique on the shape design of high arch dam is critical to dam safety and economy.

    拱坝体型设计关系大坝安全和经济关键技术问题。

    youdao

  • The concrete faceplate and plinth upstream are key areas of water retaining and seepage prevention. The anti seepage effectiveness of face affects the imperious effect and the stability of the dam.

    而此种上游混凝土面板整个坝体防渗关键部位,面板防渗好坏直接关系到大坝的防渗效果及其安全稳定性

    youdao

  • Concrete construction is the Three Gorges Dam project can progress in accordance with the requirements of the overall plan to achieve the key objectives.

    大坝混凝土施工三峡工程能否按照进度要求达到计划目标关键

    youdao

  • The paper focuses on the key and difficult technical problem of crest overflow of concrete face rockfill dam, analyses and researches spillway on dynamical and static stability.

    本文针对溢流混凝土面板堆石坝坝顶溢流关键技术难题分析研究了溢洪道静力动力稳定性。

    youdao

  • By taking a blasting as an example which mines the rockfill dam materials for Shuibuya Convansery Key Project, the fuzzy mathematics method was utilized to appreciate the blasting effect.

    水布垭水利枢纽堆石坝开采爆破试验为,运用模糊数学方法爆破试验进行效果评估。

    youdao

  • The infiltration protection wall of deepest of over 80 meters at Xiaolangdi dam is the key project to control infiltration in the sand and gravel layer at dam base.

    小浪底主坝防渗墙坝基砂砾石覆盖层渗流控制关键工程最深80多米

    youdao

  • Rock P-wave velocity as a key mark of rock quality can reflect the state of rock body quality in the dam site area.

    岩体波速作为反应岩体质量重要指标,可以反应坝址区岩体质量状况

    youdao

  • The main dam concrete construction is the key of the Baise WRPP main body project construction. Its working term is shorter and the construction quantity is larger.

    大坝混凝土施工百色水利枢纽主体工程施工关键,施工时间短工程量相对较大。

    youdao

  • After assuring the slope stability, we study the vegetation choice and the recovery vegetation, derive the project procedure and the technical key of recovery vegetation in the tailing-dam.

    边坡稳定性得到保证之后,对边坡植被选择复垦技术进行研究,得出了进行尾矿坝复垦的工程步骤和技术要点

    youdao

  • The seepage is the key effect factor to dam security, enough attention should be taken in the dam design and management, so how to analyses the seepage expediently and accurately is very important.

    而作为影响大坝安全关键性因素渗流问题得到足够重视正确的渗流分析大坝的设计运行管理一项重要工作。

    youdao

  • Hydraulic fracturing in earth core rockfill dam is a key problem which is unsolved and is given an universal attention in engineering field.

    土质墙坝的水力劈裂问题一直是工程界普遍关注又亟待解决的关键问题。

    youdao

  • In respect of geology, the key issues refer to the stability of region tectonics and the quality of rock mass for two dam sites.

    地质方面而言,坝址区域构造稳定性岩体质量是核心问题

    youdao

  • In respect of geology, the key issues refer to the stability of region tectonics and the quality of rock mass for two dam sites.

    地质方面而言,坝址区域构造稳定性岩体质量是核心问题

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定