• Create a Sprint Backlog iteration plan.

    创建一个Sprintbacklog迭代方案

    youdao

  • First, create a Sprint Backlog iteration plan.

    首先创建一个Sprintbacklog迭代方案

    youdao

  • When a task modifies to Iteration Plan artifact.

    一个任务修改迭代计划工件

    youdao

  • New work items can be added to the iteration plan in several ways.

    可以通过多种方式计划添加工作

    youdao

  • Iteration Plan for the first Elaboration iteration (almost 100% complete).

    首次精化迭代的迭代计划(计划100%完成)。

    youdao

  • The iteration plan is created by selecting the top-priority work items.

    迭代计划通过选择顶部优先的工作条目创建的。

    youdao

  • The iteration plan for the first Transition iteration is completed and reviewed.

    最初构建迭代迭代计划已经完成并且被核查过。

    youdao

  • The iteration plan for the first Elaboration iteration is completed and reviewed.

    最初精化迭代迭代计划已经完成核查。

    youdao

  • The iteration plan for the first Construction iteration is completed and reviewed.

    最初构建迭代迭代计划已经完成并且被核查过。

    youdao

  • A multipage editor will open for the Product Backlog iteration plan (see Figure 15).

    一个多页面编辑器将会Productbacklog迭代计划打开(见于15)。

    youdao

  • Team members can also take those work items and assign them to an iteration plan.

    团队成员可以拿到那些工作并且它们分配迭代计划中。

    youdao

  • A great view into this is the iteration plan view called "Planned Time." to get there.

    对此一个很有用视图就是叫做PlannedTime迭代计划视图。

    youdao

  • The same task also generates as an output an iteration plan for the subsequent iteration.

    迭代计划产生子迭代时也是同样任务

    youdao

  • If we sum up individual velocities all developers will it help us to create a better iteration plan?

    如果我们团队的全部个人开发速率累加在一起,是不是可以我们制定更好迭代计划呢?

    youdao

  • An iteration plan is a wiki-type interface that allows the team to view project progress for a targeted iteration.

    迭代计划采用wiki类型的界面允许团队查看目标迭代项目进展

    youdao

  • First, take a quick look at an iteration plan view to be sure that you understand the current task assignments.

    首先快速浏览一下迭代计划视图确定充分理解当前任务分配情况

    youdao

  • This activity completes the detailed design of the components, within the scope identified in the Iteration Plan.

    此项活动完成迭代计划的识别范围中的组件详细设计

    youdao

  • The iteration plan defines what should be delivered within the iteration, and the result is a demo-able or shippable build.

    迭代计划定义了迭代期间应当完成哪些工作,结果一个可以演示的构造。

    youdao

  • This activity addresses the detailed design of one or more components within the scope identified in the Iteration Plan.

    此项活动主要关注迭代计划识别范围中的一个多个组件详细设计

    youdao

  • At these minor milestones, progress is assessed against the goals and objectives set forth by the team in the iteration plan.

    这些局部里程碑上,要根据目的目标团队评估迭代计划中的进展

    youdao

  • Are there any actions that would mitigate the impact of occurrence that you want to take now or describe in an iteration plan?

    是否立即采取迭代计划描述用于减轻风险发生影响操作

    youdao

  • Are there any actions that will reduce the probability of occurrence that you want to take now or describe in an iteration plan?

    是否立即采取迭代计划描述的用于降低风险发生概率操作

    youdao

  • To capture additional information such as a test plan you can add additional pages to an iteration plan. Press the add page Overview page does.

    捕获诸如测试计划回顾附加信息可以计划添加附加页面

    youdao

  • Click the eye glasses icon in the toolbar (Figure 26), and the editor will split to show the Iteration plan and the currently selected item side-by-side.

    点击工具栏中的眼镜图标(26),编辑器分开显示Iteration方案,然后一起选择项目

    youdao

  • Technical Leads will prep "the iteration plan" pre-populating it with tasks, estimates and assignments all in the name of saving time during the planning meeting.

    计划会议时技术组长就预先任务估算指派等拼装成“迭代计划”,并美其名曰节省时间”。

    youdao

  • It refines the Software Development Plan (covering all project phases and iterations), and creates a fine-grained iteration Plan for the next iteration or iterations.

    提炼软件开发计划(覆盖了所有项目阶段迭代),创建了个良好而成熟的迭代计划,用于一个迭代以后的迭代。

    youdao

  • As mentioned above, the ability to design an iteration plan that removes risk so that the project tracks the curve shown in Figure 6 is a hallmark of an effective project manager.

    上面所提到设计去除风险以便项目遵从6中所曲线迭代计划能力检验高效的项目经理标志

    youdao

  • Similar to the previous instructions for creating the Product Backlog iteration plan, right-click on Sprint 1 (1.0) in the Plans node of the Team Artifacts view, select New and then Plan.

    前面创建ProductBacklog迭代计划指南类似TeamArtifacts视图Plans节点Sprint1 (1.0),选择New然后选择 Plan

    youdao

  • When it is time for the next sprint, use the same approach for creating an iteration plan for Sprint 1 to create one for Sprint 2, then start moving Product Backlog items into it for planning.

    到了开始下一个迭代的时候,使用同样方法Sprint1创建迭代计划创建 Sprint2然后开始为了规划 ProductBacklog项目里面 。

    youdao

  • When it is time for the next sprint, use the same approach for creating an iteration plan for Sprint 1 to create one for Sprint 2, then start moving Product Backlog items into it for planning.

    到了开始下一个迭代的时候,使用同样方法Sprint1创建迭代计划创建 Sprint2然后开始为了规划 ProductBacklog项目里面 。

    youdao