According to the final results of analysis, a reasonable excavation length of inverted arch in one step was put forward and applied to the construction of multi-arch tunnel in loess.
最后提出了最佳的黄土仰拱一次性开挖长度,并应用于黄土连拱隧道的施工。
According to the special structure of precast block of inverted arch for TBM construction tunnel, the dynamic construction state is modeled by FEM with surrounding rock - structure calculating model.
针对TBM施工隧道仰拱预制块的特殊结构,采用围岩-结构模式,进行了模拟施工动态的受力影响计算分析。
According to the special structure of precast block of inverted arch for TBM construction tunnel, the dynamic construction state is modeled by FEM with surrounding rock - structure calculating model.
针对TBM施工隧道仰拱预制块的特殊结构,采用围岩-结构模式,进行了模拟施工动态的受力影响计算分析。
应用推荐