The design considers the integral effect of the upstream headwater channel and downstream scout gallery.
本设计考虑了上游引水渠和下游冲沙廊道布置对漏斗水流整体的影响。
The effective organization and unified planning of its links have helped achieve the goal of the shortest cycle, lowest cost, best results and optimum integral effect.
各环节有效组织、统筹规划,使周期最短、成本最低、效果最好,最终整体效果达到最优的目的。
The effective organization and unified planning of its links have helped achieve the goal of the shortest cycle, lowest cost, best results and optimum integral effect.
各环节有效组织、统筹规划,使周期最短、成本最低、效果最好,最终整体效果达到最优的目的。
应用推荐