• The team then cuts and pastes graphics from the slides to create formal project documentation, including requirements specifications.

    然后团队幻灯片剪切粘贴图形创建正式项目文档包括需求规范。

    youdao

  • Expectations generate other expectations, including project budgets, timelines, and requirements, as we have seen.

    我们见,期望生成其他期望,包括项目预算时间线需求

    youdao

  • Figure 1 shows the expectations that a project team needs to fulfill, including requirements and many others.

    1表现一个项目团队需要满足期望包括需求许多其它的。

    youdao

  • This list will represent all of the requirements in the project in their hierarchical structure, including folders (see Figure 10).

    列表将会展示项目所有需求分层结构包括文件夹如图10所示)。

    youdao

  • Managing a RUP project can be more challenging in the early phases, since we have to work on all disciplines in parallel, including requirements, coding, and testing.

    管理一个RUP项目开始阶段有些挑战性因为我们同时考虑各种条件约束,包括需求编程以及测试。

    youdao

  • There are nine RUP workflows, including requirements, project management, configuration & change management, and even one for business modeling -- but not one for software quality assurance (SQA).

    存在九个RUP工作流程包括需求项目管理配置&变更管理,甚至还有业务建模--但是没有是用于软件质量保证(SQA)的。

    youdao

  • Expectation management can benefit a project by constantly validating its management directives, including the business case, budget, schedule, and scopeincluding detailed requirements.

    通过经常确认项目管理方向包括业务用例预算进度范围——包括详细需求期望管理可以一个项目带来益处

    youdao

  • This will display all the scope elements for the highlighted project (in this example: RequisitePro Integration), including the imported requirements from RequisitePro.

    显示所有项目范围元素RequisiteProIntegration),包括 RequisitePro 中导入需求

    youdao

  • Those criteria, including performance requirements and essential conditions, which must be met before project deliverables are accepted.

    项目交付成果验收必须满足标准包括性能要求各项重要条件

    youdao

  • Requirements volatility (RV) is a common information system project risk that can have severe consequences including cost and schedule overruns and at times, even cancelled projects.

    需求波动信息系统建设比较常见的风险,很可能造成进度延期、成本超支甚至项目取消

    youdao

  • A design project of on-board computers of micro-satellite including spare system and parallel system is proposed according to the rigorous requirements for reliability and real-time performance.

    针对微小卫星星载计算机系统可靠性和实时性苛刻要求提出一种冷、热备份并存的微小卫星星载计算机系统设计方案

    youdao

  • A design project of on-board computers of micro-satellite including spare system and parallel system is proposed according to the rigorous requirements for reliability and real-time performance.

    针对微小卫星星载计算机系统可靠性和实时性苛刻要求提出一种冷、热备份并存的微小卫星星载计算机系统设计方案

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定