Formulation and tables presented have application in project design.
提交的公式和图表可应用于工程设计。
So if we use ta in project design, we should take measures to relieve the influence of ta saturation.
因此在工程设计中选用TA时,需要采取恰当的措施来减轻TA饱和的影响。
An introduction to how to make selection of fire automatic protection functionality in project design was made.
介绍了火灾自动保护功能在工程设计中如何选配。
Experience around the world has shown that allowing stakeholders a voice in project design, management and evaluation improves results.
世界各国的经验表明,允许利益相关者在项目设计、管理和评估中享有发言权有助于改善项目的效果。
Suggests that the thermal comfort effect and initial cost be taken into account in selection of ventilation type in project design.
建议工程设计时应综合考虑热舒适性和经济性来确定座椅送风形式。
A new technique based on ants system is put forward in this paper, which can solve the combinational optimization problem in project design.
介绍了用蚁群系统来解决方案设计中存在的组合优化问题。
The working performance and stability of the rock bolt crane girder has always being an important problem in project design and construction.
岩锚吊车梁在施工及运行期的工作性态和稳定性是工程设计和施工中所关注的主要问题之一。
A gender component was introduced after the Bank prepared its 2002 gender Action Plan, resulting in a greater participation of women in project design and activities.
2002年世行编制其《性别行动计划》后,该规划还增设了性别内容,进而提高了妇女在项目设计和活动中的参与程度。
Discusses the main contaminants in decorating material malls. Presents a calculating formula of ventilation rate and points out some key issues in project design.
分析了装饰建材超市的主要污染物,给出了其通风量计算公式,指出了工程设计中应注意的问题。
The calculation of transients in hydropower station and its analysis is one of important items for study in project design and operation as well as maintenance of hydropower station.
水电站过渡过程计算分析是水电站工程设计与运行维护中的一项重要研究内容。
The selection of parameters in smooth and presplitting blasting plays an important role in blast effect. It is an important part in project design of smooth and presplitting blasting.
爆破参数的选择直接影响着爆破效果,是光面、预裂爆破工程设计的重要内容。
Taking an afforestation and desertification project as a case, this paper illustrates how to apply participatory socioeconomic assessment to analyze socioeconomic factors in project design.
文章以某造林治沙项目为例,阐述如何应用参与式社会经济评估方法来发现和分析项目设计中的社会经济问题。
The alliances are most valuable when scientists and artists have a shared stake in a project, are able to jointly design it and can critique each other's work.
当科学家和艺术家在一个项目中拥有共同的利益,能够共同设计项目,并且能够相互评价对方的工作时,他们的联盟才是最具价值的。
Furthermore it guides the next step system design and development in the collaborated environment to reduce the project risk.
而且,它将指导在协作环境中的下一步系统设计和开发工作,从而减少项目风险。
A set of "practical" work products, or tools, which can be used in almost any portal project to help you gather, track, design, and deploy a successful portal.
一组“实用的”工作产品或工具,可以在几乎任何门户项目中使用,帮助您收集、跟踪、设计和部署成功的门户。
Conventional software engineering wisdom says that you should do as much design as possible early on in a project, because it is difficult to reverse key decisions later.
软件工程领域通常提到,您应该在项目中尽可能早地多作设计,因为之后再改变关键决策时是一件很麻烦的事情。
All of those questions and more play a significant role in determining how long this project is going to take — from design to deployment.
所有这些问题以及其他更多的问题在确定此项目从设计到部署所用的时间方面都起着重要作用。
In the initial project design stage and during the pilot implementation stage, we faced several challenges related to making the move to topic-based, information-typed content development.
在最初的项目设计阶段和试验性实现阶段中,我们遇到了与转向基于主题的、信息类型化内容开发有关的一些挑战。
Systematic projects include long-term consideration and project planning in the process of design and technology selection for the application.
系统的项目包括长期的考虑和应用的设计与技术选型过程中的项目规划。
It was applied to solve several different problems and, along with the proxy pattern, became a core project metaphor that was often discussed in design sessions.
它与代理模式一起被用来解决几种不同的问题,并成为设计会议中常常讨论的一项核心项目课题。
Because genericness adds entropy, you damage your ability to evolve the design in interesting ways early in the project.
因为一般性将增加熵,所以您将破坏在项目初期中通过有趣的方式演化设计的能力。
In order to make your test cases maintainable and reusable in a large project, please follow object-oriented design and other standard practices.
为了能让你的测试案例在大型的项目中可维护并可重复使用,请遵循面向对象设计和其他标准实践。
Most of the architecture (described in Part 1) work is performed during the analysis and design workflow, in the elaboration phase of a project.
大多数体系结构(在 第 1部分中有述)工作是在分析和设计的工作流中、在项目的细化阶段执行的。
In this scenario, however, it is still likely the team will be dependent on external design documents that may not be generated until later in the project lifecycle.
然而,在这种情景下,这个团队很可能依靠于那些直到在项目生命周期的晚期才生成的外部设计文档。
For every design project in the pipeline, Mr. Jobs will hold meetings of two or three hours every week or two with key members of the product team.
针对正在开发的每个设计项目,乔布斯每一到两周都会花两三个小时和产品小组的重要成员开会讨论。
Designing availability solutions in the end-to-end project lifecycle indicates the activities relevant to the design of availability solutions at different points in the overall project lifecycle.
在端对端项目生命周期内设计可用性解决方案指出与在整个项目生命周期中的不同点设计可用性解决方案相关的活动。
It is always being revised, refined or changed in some way, unlike a construction project or developing a new dishwasher design.
软件项目经常会被改进、增强或以其他形式变更,而不像建筑项目或设计洗碗机这类项目。
This will probably occur daily in the early stages of the project, that is, in the design phase.
在项目的早期阶段(即设计阶段),可能要每天进行此操作。
This will probably occur daily in the early stages of the project, that is, in the design phase.
在项目的早期阶段(即设计阶段),可能要每天进行此操作。
应用推荐